bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

12 Struts W.rubber Mounts > < 3 RA Lowering_raising Front Axle Carrier (universal Lifter)|Page 963
Page 3
background image

Note:

The jacking points on the left side are shown.

 

Align special tools  31 5 255  and 31 5 256  to front axle
carrier.

Support front axle carrier by operating workshop jack 00 2 030 .

Release screws (1, 2).

Installation:

Check threads for damage; if necessary, repair with Helicoil thread
inserts.

Tighten down first screws (1) and then screws (2).

Tightening torque  31 10 1AZ

.

Important!

Risk of damage!

Follow operations must be carried out during lowering:

Remove heat exchanger from front axle carrier and tie up

Remove stabilizer (conventional) from front axle carrier
and tie back

Remove all hydraulic lines on front axle carrier or
stabilizer retaining bracket and tie up

Version with active front steering: Disconnect plug
connection and expose connecting line up to power
steering gear

 

Lower front axle carrier by max. 10 cm.

After installation:

Perform chassis alignment check

Carry out steering angle sensor adjustment/adjustment for

active front steering

RA  Lowering/raising front axle carrier (universal lifter)

BMW AG - TIS

08.02.2013  02:39

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

12 Struts W.rubber Mounts > < 3 RA Lowering_raising Front Axle Carrier (universal Lifter)|Page 963