X Series E70 X5 4.8i (N62TU) OFFRD
Expose pressure line up to cutting line on front axle carrier.
Release nut (1) and remove pressure line (2).
Installation:
Make sure hydraulic line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 11AZ
.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Replacing pressure line for power steering (from vane pump to cutting line) (N62
BMW AG - TIS
08.02.2013 03:55
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -