X Series E70 X5 4.8i (N62TU) OFFRD
Remove foam material (1).
Undo screw (1) and feed out refrigerant line (2).
Installation:
Replace sealing rings and moisten with refrigerant oil.
Tightening torque 64 53 3AZ
.
After installation:
•
Evacuate and fill A/C system
RA Replacing line from compressor to condenser
BMW AG - TIS
08.02.2013 15:45
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -