Z Series E85 Z4 2.5i (N52) ROADST
Unscrew nuts (1).
Tightening torque: 22 32 3AZ
.
Unfasten screws (2).
Tightening torque: 22 32 4AZ
.
Remove cross member.
•
Remove propeller shaft from transmission.
•
Release center bearing.
•
Tie propeller shaft to one side.
Tasks are described in Removing propeller shaft.
Detach locking clip.
Pull shift rod (1) out of shift rod joint (2).
Installation:
Grease shift rod pin (3).
Grease,
refer to BMW Service Operating Fluids.
RA Removing and installing transmission (GS6-17BG) N52
BMW AG - TIS
12.02.2013 04:58
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -