buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Service Reminder Indicators > < Instrument Panel Electrical Center or Junction Block Replacement|Page 1549
Page 5
background image

4. Position the junction block to the housing. Align the tabs and press the junction block into place to secure the junction block.

5. Install the positive battery cable lead (1) to the stud on the junction block. 

Install the positive cable lead nut to the stud.

Tighten the nut to 16 Nm (12 lb ft).

6. Close the cover (2) on the junction block.
7. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (L26)   (See: Starting and

Charging/Battery/Battery Cable/Service and Repair)Battery Negative Cable Disconnection and Connection (LS4)   (See: Starting and
Charging/Battery/Battery Cable/Service and Repair).

Service Reminder Indicators > < Instrument Panel Electrical Center or Junction Block Replacement|Page 1549