Rainier 2WD V8-5.3L VIN P (2004)
41. Twist together 2 connector wire leads-the high circuits from both stages of the IP module-to one of the deployment harness wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
42. Inspect that the 3 wire connection is secure.
43. Bend flat the twisted connection.