Rainier 2WD V8-5.3L VIN P (2004)
44. Secure and insulate the 3 wire connection to the deployment harness using electrical tape.
45. Twist together 2 connector wire leads-the low circuits from both stages of the IP module-to the deployment harness wire. Refer to SIR Connector
End Views in order to determine the correct circuits.
46. Inspect that the 3 wire connection is secure.
47. Bend flat the twisted connection.