buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

CB Series Pump|Page 11455 > < CB Series Pump
Page 2
background image

Fig. 7  Rotor And/Or Pump Ring Installation. CB Series Power Steering Pump

DISASSEMBLE

1. Disconnect battery ground cable, then remove power steering pump from vehicle. Refer to individual car chapters for procedures.
2. Remove union fitting with O-ring and the O-ring seal, Fig. 5.
3. Remove control valve assembly and flow control spring.
4. Protect driveshaft with shim stock and remove driveshaft seal by cutting with small chisel. Discard seal.
5. Remove return tube using tap, nut and washers, Fig. 6, as follows. Plug return tube to prevent chips from entering pump.

a. Stack five 5/8 inch washers onto return tube.
b. Run one 9/16 inch-12 nut midway up a 9/1 inch 12 tap.
c. Install threaded end of tap into return tube until nut is positioned against washers.
d. Using wrench, hold top stationary while turning nut clockwise.

6. Remove end cover retaining ring by inserting punch in access hole.
7. Gently push on driveshaft to assist in removing end cover, O-ring, pressure plate spring, pump ring, pump vanes and the driveshaft subassembly,

consisting of pump rotor, thrust plate, driveshaft and shaft retaining ring.

8. Remove O-ring from housing.
9. Remove dowel pins, then the driveshaft seal if not previously removed.

10. Remove pressure plate, pressure plate spring and O-ring from end cover.
11. Remove shaft retaining ring from driveshaft, then the pump rotor and thrust plate.

INSPECTION

1. Clean all parts in power steering fluid, then dry thoroughly.
2. Inspect pump ring, vanes, thrust plate, pressure plate and driveshaft for scoring, pitting or chatter marks, replacing parts as necessary.

ASSEMBLE

1. Lubricate new driveshaft seal with power steering fluid and, using seal installer tool No. J 7728, or equivalent, press driveshaft seal into pump

housing.

2. Install pump ring dowel pins into housing.
3. Install thrust plate and pump rotor onto driveshaft, Fig. 7.
4. Install new shaft retaining ring onto driveshaft.
5. Install driveshaft subassembly into housing.
6. Install pump ring with holes positioned correctly onto dowel pins, Fig. 7, in housing.
7. Install vanes into pump rotor.
8. Lubricate new O-ring (large) with power steering fluid and install O-ring into end cover.
9. Install pressure plate and pressure plate spring.

10. Lubricate new O-ring (small) and install O-ring into end cover.
11. Lubricate outer edge of end cover with power steering fluid and press end cover into housing.

CB Series Pump|Page 11455 > < CB Series Pump