CTS V6-2.8L (2006)
74. Bend flat the twisted connection.
75. Secure and insulate the 3 wire connection to deployment harness using electrical tape.
76. Twist together 2 connector wire leads (the low circuits from side air bag and pretensioner) to one sets of deployment wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
77. Inspect that the 3 wire connection is secure.
78. Bend flat the twisted connection.
79. Secure and insulate the 3 wire connection to deployment harness using electrical tape.
80. Connect the deployment harness to the passenger side air bag/pretensioner yellow connector.