CTS V6-3.2L VIN N (2003)
2. Press down on the defroster duct (1) until you hear the tabs engage.
3. Install the pushpins to the mag beam.
4. Install the IP retainer.
2. Press down on the defroster duct (1) until you hear the tabs engage.
3. Install the pushpins to the mag beam.
4. Install the IP retainer.