cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

Procedures|Page 7631 > < Procedures
Page 2
background image

2. Position hazard switch wire harness (1) in the harness retainers.
3. Push the wire service loop forward between the duct as the vent is positioned on the I/P.
4. Overlap the vent housing over the duct.
5. Position the vent into the I/P.

IMPORTANT:  Ensure that the wire harness is not interfering with the moving parts of the vent.

6. Push the vent in to the I/P in order to seat the retainers.

Deflector Replacement - Instrument Panel Air-Left

DEFLECTOR REPLACEMENT - INSTRUMENT PANEL AIR - LEFT 

REMOVAL PROCEDURE 

1. Using a small flat bladed tool, insert between the air vent and the I/P retainer.
2. Pry out in order to release the retainer securing the air vent.

INSTALLATION PROCEDURE 

Procedures|Page 7631 > < Procedures