cadillac Workshop Repair Guides

Cadillac Workshop Service and Repair Manuals

AIR Pump Intermediate Pipe/Hose Replacement - Bank 1|Page 4924 > < 05-07-30-029|Page 4921
Page 1
background image

Air Injection Hose/Tube: Service and Repair
AIR Pump Intermediate Pipe/Hose Replacement - Bank 1

REMOVAL PROCEDURE

1. Loosen and lower pinch clamp connecting the bank 1 intermediate pipe/hose to the crossover pipe/hose.
2. Loosen and lower the pinch clamp connecting the bank 1 intermediate pipe/hose to the secondary air injection (AIR) shut-off valve.
3. Remove the nut securing the bank 1 intermediate pipe/hose to the transaxle.
4. Remove the nut securing the bank 1 intermediate pipe/hose to the AIR shut-off valve bracket.
5. Disconnect the exhaust gas recirculation (EGR) pipe.
6. Carefully remove the bank 1 intermediate pipe/hose from the engine.

INSTALLATION PROCEDURE

1. Carefully install the bank 1 intermediate pipe/hose.

NOTE:  Refer to Fastener Notice in Service Precautions.

2. Reconnect the EGR pipe.

Tighten
Tighten the EGR pipe to 60 N.m (44 lb ft).

3. Install the nuts securing the bank 1 intermediate pipe/hose to the AIR shut-off valve bracket and the transaxle.

Tighten
Tighten the nuts to 9 N.m (80 lb in).

4. Install the hose and pinch clamp connecting the bank 1 intermediate pipe/hose to the AIR shut-off valve.
5. Install the hose and pinch clamp connecting the bank 1 intermediate pipe/hose to the AIR crossover pipe/hose.

AIR Pump Intermediate Pipe/Hose Replacement - Bank 1|Page 4924 > < 05-07-30-029|Page 4921