Seville V8-300 4.9L (1991)
3. High-Pressure liquid line from inlet pipe assembly.
Tighten
^
Inlet line fitting to 24 Nm (18 lb. ft.).
4. Refrigerant line screw and clip.
5. Evacuate and charge system.
6. Leak test all refrigerant connections.
3. High-Pressure liquid line from inlet pipe assembly.
Tighten
^
Inlet line fitting to 24 Nm (18 lb. ft.).
4. Refrigerant line screw and clip.
5. Evacuate and charge system.
6. Leak test all refrigerant connections.