chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Secondary Air Injection Shut-Off Valve Outlet Pipe/Hose Replacement|Page 6762 > < Secondary Air Injection Shut-Off Valve Outlet Pipe/Hose Replacement|Page 6760
Page 1
background image

Air Injection Control Valve: Service and Repair
Secondary Air Injection (AIR) Shut Off Valve Replacement

REMOVAL PROCEDURE

1. Release the clamp (4) securing the AIR hose to the AIR pump assembly base.
2. Release the clamp (5) securing the AIR hose to the AIR pump shut-off valve.

3. Remove the AIR hose from the AIR pump shut-off valve outlet port (3).
4. Remove the vacuum line (5) from the vacuum port (4) of the AIR pump shut-off valve.
5. Release the AIR pump shut-off valve inlet port (1) from the AIR pump outlet hose.

INSTALLATION PROCEDURE

Secondary Air Injection Shut-Off Valve Outlet Pipe/Hose Replacement|Page 6762 > < Secondary Air Injection Shut-Off Valve Outlet Pipe/Hose Replacement|Page 6760