C 2500 Truck 2WD V8-5.7L VIN R (1997)
-
Rotate the retainer into position and ensure all three "Ears" are visible on the inside of the connector and the ring can move in the slots freely.
-
Repeat the above procedures for installation of the remaining retaining ring.
NOTICE: Ensure the cooler line has the plastic cap positioned onto the cooler line. If no plastic cap exist, obtain a NEW plastic cap and
position It onto the cooler line prior to cooler line installation.