chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Fastener Tightening Specifications (Unit Repair)|Page 5870 > < Fastener Tightening Specifications (Unit Repair)|Page 5868
Page 2
background image

5. Remove the retaining ring from the quick connect fitting.
6. Discard the retaining ring.

7. Pull the cooler line straight out from the quick connect fitting.
8. Remove the retaining ring (E-clips) securing the cooler line to the quick connect in order to remove the remaining cooler lines from the remaining

quick connect fittings.

9. Remove the cooler lines from the vehicle.

Installation Procedure 

1. Install the oil cooler line to the transmission and radiator.

Important:  Do not reuse any of the existing retaining rings that were removed from the existing quick connect fittings. All retaining rings being
installed must be New.

2. Install the new retaining ring (E-clip) into the quick connect fitting.

Fastener Tightening Specifications (Unit Repair)|Page 5870 > < Fastener Tightening Specifications (Unit Repair)|Page 5868