Express 3/4 Ton Van V8-5.7L VIN R (1998)
6. Remove the oil pass cover bolt.
7. Remove the oil pass cover.
8. Remove the spacer plate.
9. Remove the spacer plate gaskets.
10. Remove the 3-4 accumulator spring.
11. Remove the piston oil seal ring.
12. Remove the 3-4 accumulator piston, and the pin.
INSTALLATION PROCEDURE
^
Tools Required:
-
J25025-B Pump and Valve Body Alignment Pin Set