Impala V6-3.8L SC VIN 1 (2005)
![background image](/chevrolet/impala/v6-3.8l_sc_vin_1/Page-1807006.png)
40. Twist together 2 connector wire leads, the high circuits from both stages of the I/P module, to one of the deployment harness wires. Refer to SIR
Connector End Views in order to determine the correct circuits.
41. Inspect that the 3 wire connection is secure.
42. Bend flat the twisted connection.
43. Secure and insulate the 3 wire connection to the deployment harness using electrical tape.
44. Twist together 2 connector wire leads, the low circuits from both stages of the I/P module, to the deployment harness wire. Refer to SIR Connector
End Views in order to determine the correct circuits.
45. Inspect that the 3 wire connection is secure.
46. Bend flat the twisted connection.