Tahoe 2WD V8-5.3L (2007)
Bend the foam into a "banana" shape to match the floor plan curvature.
Place the foam behind the electrical channel. Leave room for the harness.
Note that the front inside corner will ride up onto the sealant bead.
Press/rub the foam to ensure a good bond.
Reinstall the trim and the weatherstrip.
Parts Information
There may be two parts per package although only one piece is required per side. GMSPO is working on this and it should be corrected shortly.
Warranty Information
For vehicles repaired under warranty, use the table.