chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Engine - Intake Manifold Inspection/Replacement|Page 2180 > < Engine - Intake Manifold Inspection/Replacement|Page 2178
Page 4
background image

^

The A/C ECT switch (3) (A/C equipped vehicles)

^

The EGR temperature sensor

INSTALLATION PROCEDURE 

1. Install the following to the intake manifold if required:

^

The PCV valve

^

The EGR valve

^

The ECT sensor (4)

^

The ECT sensor sending unit

^

The A/C ECT switch (3) (A/C equipped vehicles)

^

The EGR temperature sensor

NOTICE:  Refer to Fastener Notice in Service Precautions.

2. Install a new intake manifold gasket (3) and the intake manifold (4) with intake surge tank (1) and throttle body (2) to the cylinder head. Secure

with eight nuts and three bolts.
^

Tighten the intake manifold nuts and bolts to 23 Nm (17 ft. lbs.).

Engine - Intake Manifold Inspection/Replacement|Page 2180 > < Engine - Intake Manifold Inspection/Replacement|Page 2178