chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Handling/Shipping/Scrapping|Page 7710 > < Handling/Shipping/Scrapping|Page 7708
Page 6
background image

16. To use the flange mount method, use four of the J 39401-13 hold-down nuts whenever possible in order to secure the module to the fixture.
17. If clearance restrictions do not allow the use of the J 39401-13 hold-down nuts, four M6 x 1.0 nuts with washers may be used.

18. Extend the SIR deployment harness and adapter to full length from the module.
19. Place a 12 V minimum/2A minimum power source (i.e., vehicle battery) near the shorted end of the harness.

20. Connect the module (1) to the adapter (2) on the SIR deployment harness (3).
21. Firmly seat the adapter into the module connector.
22. Clear the area of people.

Handling/Shipping/Scrapping|Page 7710 > < Handling/Shipping/Scrapping|Page 7708