chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Ignition Relay|Testing and Inspection|Page 360 > < Ignition Relay|Testing and Inspection
Page 2
background image

Steps 1-4

Steps 5-17

The numbers below refer to the step numbers in the diagnostic table.
1. The Diagnostic System Check-Computers and Control Systems prompts the technician to complete some basic checks and store the Freeze Frame

data on the scan tool if applicable. This creates an electronic copy of the data taken when the fault occurred. The information is then stored in the
scan tool for later reference.

6. This step will verify whether the PCM is not providing a ground path for the main relay circuit. When terminal 2 of the main relay is grounded, the

main relay turns ON.

9. This step checks for ignition positive voltage at the PCM. The PCM will not operate the main relay if there is no power to terminal 20.

Ignition Relay|Testing and Inspection|Page 360 > < Ignition Relay|Testing and Inspection