PT Cruiser L4-2.4L (2008)
Shift Rail: Removal and Replacement
Removal
REMOVAL
1. Thread Remover 6786 (1) into shift rail bushing.
2. Install slide hammer C-3752 (2) onto tool.
3. Remove bushing (3) using slide hammer and tool assembly.
Installation
INSTALLATION
1. Line up replacement bushing in bore.
2. Using Installer MD998343, tap bushing into bore until flush with the chamfer in the case.