Sebring Convertible V6-2.5L VIN H (1997)
3. Install trailing link hanger bracket on vehicle and loosely install the 4 attaching bolts. Then install 2 drift pins of appropriate size in positioning
holes on hanger bracket and into locating holes in body. With hanger bracket correctly positioned on vehicle tighten the 4 hanger bracket mounting
bolts to a torque of 34 Nm (25 ft. lbs.).
CAUTION: When installing trailing link bushing retainers, retainers must be installed with cupped side of retainer facing away from bushing and
knuckle.
4. At the knuckle, install the outer trailing link bushing, outer bushing retainer and retaining nut on trailing link. Using a large adjustable wrench on
flat of trailing link to keep it from rotating tighten the trailing link retaining nut to a torque of 99 Nm (73 ft. lbs.).