Removing - refitting: timing belt
- Make
- Citroën
- Model
- AX Factory Workshop Manual
- Year
- 1986–1998
- Section
- Timing gear › Removing - refitting: timing belt
Removing - refitting: timing belt
1. Recommended tools
[1] flywheel locating peg 4507-T.A (kit 4507-T).
[2] injection pump setting rod 4527-T.S1 (kit 4507-T).
[3] camshaft gear setting rod 4527-T.S2 (kit 4507-T).
[4] toothed belt pinion locking tool 6016-T.
[5] tensioning lever 4507-T.J (kit 4507-T).
[6] belt tension measuring instrument with digital read out (SEEM).
4099-T: SEEM C.TRONIC 105.
4122-T: SEEM C.TRONIC 105.5.
2. Removing
Disconnect the battery negative cable.
Remove the accessories drive belt (see the relevant operation).
The crankshaft pulley.
Remove the upper timing cover.
Remove the lower timing cover.
Peg the flywheel with tool [1].
Peg:
- The injection pump pinion by means of tool [2]
- The camshaft gearwheel using tool [3]
Loosen the roller tensioner nut.
Remove the timing belt.
3. Refitting
ESSENTIAL: Check that the roller tensioner turns freely (no tight spot). Ensure that the fixed roller rotates freely (no tight spot). Otherwise, replace the rollers.
Hold the pinion in place with tool [4] to unscrew screws (1).
Slacken the bolts (1).
Hold the pinion in place with tool [4] to unscrew screws (2).
Slacken the bolts (2).
Position the camshaft gearwheel as far as the slotted holes will allow, but do not tighten fixing screws (*).
Position the injection pump drive pinion as far as the slotted holes will allow, but do not tighten fixing screws (*).
N.B.: (*) (direction of rotation, or clockwise).
Install the timing belt over:
- The crankshaft gear
- The injection pump gear
- The camshaft gear
- The coolant pump gear
CAUTION: When positioning the belt over the pinions, rotate them in the opposite direction to rotation so as to engage the nearest tooth.
Pre-tension the belt (belt runs slightly tensioned).
N.B.: Check that the pinion fixings are not engaged to the extent of the slot (move by one tooth if necessary).
Tighten the bolts (1) and (2) to 0,5 m.daN.
Slacken the bolts by 180°.
Slightly tighten the screws, by hand.
Loosen the roller tensioner nut.
Operate the roller tensioner to tension the belt to 100 SEEM units, by means of tools [5] and [6].
Tighten the roller tensioner fixing nut to 2,3 m.daN.
Tighten the bolts (1) and (2) to 2,3 m.daN.
(hold the pinions in place with tool [4].
Remove the tool [4].
Remove tools [2], [3]and [6].
Turn the engine 10 revolutions.
Peg the flywheel with tool [1].
Peg:
- The injection pump pinion by means of tool [2]
- The camshaft gearwheel using tool [3]
N.B.: If needed, slightly release the belt (slightly loosen the roller tensioner fixing).
Slacken screws (1) and (2) by 360 °.
Slightly tighten the screws, by hand.
Carry out the final belt tensioning to 55 ± 5 SEEM units, by means of tools [5] and [6].
Tighten the roller tensioner fixing nut to 2,3 m.daN.
Tighten the bolts (1) and (2) to 2,3 m.daN.
Remove tools [5] and [6].
Remove tools [2] and [3].
Turn the engine 2 revolutions.
N.B.: If the belt is not correctly placed over the pulleys, rotate the engine through 2 supplementary revolutions.
Peg the flywheel with tool [1].
Check visually that the setting rods engage freely in the following components:
- The camshaft gear
- The injection pump gear
CAUTION: Otherwise, repeat the timing setting procedure.
Remove the tool [1].
Refit the timing covers: Tighten the bolts to 0,7 m.daN.
Fit crankshaft pulley: Tighten the bolts to 2 m.daN.
Reinstall the auxiliary equipment drive belt.
Reconnect the battery.
Parts & tools for this job For 1986 Citroën AX
- PARTTiming belt kitSearch: Citroën AX 1986 timing belt kit
- TOOLEngine timing tool setSearch: Citroën engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.