Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Wiring harnesses23 Instruments and warning lamps24 Locking, alarm and airbags25 Electrical - driver assistance systems26 Heating, air conditioning and audio
Citroën Berlingo (B9) Van Factory Workshop Manual (2008-2018)01 · Engine
01 · Engine

Draining - filling - bleeding: Cooling system

Make
Citroën
Model
Berlingo (B9) Van Factory Workshop Manual
Year
2008–2018
Section
Cooling system › Draining - filling - bleeding: Cooling system
EngineDraining - filling - bleeding: Cooling system

Draining - filling - bleeding: Cooling system

Citroën Berlingo (B9) Van · Draining - filling - bleeding · Ref. D1AI0103P0

Applies to: Electrical

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Tooling

toolReferenceDesignation
Figure e5ai007t
[0165-2]Cable pliers for flexible clips
Figure e5ab1cnt
[01102]Tool for filling the cooling system by vacuum
Figure e5ab1jpt
[0173-C / 4370]
blocking rod for filling cylinder
Figure e5ab0kit
[0173-2]Filling cylinder for bleeding cooling circuits

2. Location

Figure d1ai004d

"1": Degassing box tap.

"2": Bleed screw (Electric machine management ECU).

"3": Bleed screw (On-board charger).

"4": Lower cooling hose.

"5": Bleed screw (Coolant pump).

3. Draining the cooling system

Put the vehicle on a hoist.

N.B.: Place a clean tray underneath the engine to recover the coolant.

CAUTION: Use a receptacle that is sufficiently large to take the totality of the coolant fluid.

Figure d1ai005d

Uncouple the cooling hose (4)   (at "a"); Using tool [0165-2].

Remove:

  • The cap (1) of the expansion bottle
  • The bleed plugs (2), (3)

N.B.: An additional quantity of fluid runs out.

Allow the coolant to run out.

CAUTION: If the tool for filling the cooling system by vacuum [01102] is used, measure the quantity of coolant drained.

4. Filling the cooling system

CAUTION: If the cooling system is contaminated, rinse with clean water.

CAUTION: Always use new coolant.

CAUTION: Each filling operation must always be followed by a cooling system degas operation.

4.1. Filling using the tool for filling the cooling system by vacuum (Recommended procedure)

Couple the cooling hose (4)   (at "a"); Using tool [0165-2].

Refit:

  • The vehicle to its wheels
  • The bleed plugs (2), (3)
Figure d1ai006d

Install the vacuum filling equipment [01102] in place of the filler cap (1)   (at "b").

CAUTION: To avoid entry of air into the circuit, provide for 20 % additional coolant.

Prepare a receptacle of coolant containing the quantity of fluid drained + 20 %.

N.B.: The receptacle must be positioned slightly lower than the equipment for filling by vacuum.

Figure b1gi079d

Place the cooling circuit under a vacuum to reach 0.9 bar:

  • Wait 10 seconds and check that the value obtained does not drop
  • Fill the cooling circuit completely and wait for the return to 0 bar

N.B.: The quantity of coolant filled should correspond to the quantity of fluid drained.

Repeat the operation until the cooling system is full.

CAUTION: Remove the equipment for filling by vacuum [01102] and rinse the assembly with clean water.

4.2. Filling the cooling system by gravity

Couple the cooling hose (4)   (at "a"); Using tool [0165-2].

Figure d1ai007d

Fit the assembly of filling cylinder [0173-2] and blocking rod [0173-C / 4370] on the filling aperture.

Open the rod [0173-C / 4370] on the filling cylinder [0173-2].

Slowly fill the cooling system with clean coolant.

Open the bleed screw (5).

Close the bleed screw (5) when the fluid flows clean and without air bubbles.

5. Degassing and checking the cooling system

Figure d1ai007d

Fit the filling cylinder [0173-2], rod [0173-C / 4370] assembly on the filling aperture, in the case of draining using the tool for filling by vacuum.

Open the rod [0173-C / 4370] on the filling cylinder [0173-2].

Turn the electric drive machine control and locking dial to position "P".

Apply the handbrake.

Depress the brake pedal.

Turn the ignition key until the "vehicle ready" indicator lamp comes on in green.

Allow the cooling system to degas for 15 minutes.

N.B.: If the coolant pump is noisy, this indicates that it is deprimed, start the bleed again on screw (5).

N.B.: The cutting in of the fan assembly is not necessary for electric vehicles.

CAUTION: Check that there are no coolant leaks.

Switch off the ignition.

Blank the filling cylinder [0173-2] using the blocking rod [0173-C / 4370].

Remove the assembly of filling cylinder [0173-2] and blocking rod [0173-C / 4370].

Figure d1ai009d

CAUTION: Do not fill the system past the max mark.

Check the coolant fluid level.

Refit and tighten the cap on the header tank.

Return the vehicle to its wheels.

Parts & tools for this job For 2008 Citroën Berlingo

As an Amazon Associate we earn from qualifying purchases.