Removing - refitting: Power unit
- Make
- Citroën
- Model
- Berlingo (M59) Multispace Factory Workshop Manual
- Year
- 2002–2008
- Section
- Engine assembly › Removing - refitting: Power unit
Removing - refitting: Power unit
ESSENTIAL: Observe the safety and cleanliness recommendations (refer to the brochure: RECOMMENDATIONS - PRECAUTIONS).
1. Recommended tools
[1] lifting bench 5702-T.A.
[2] engine support 5704-T.
[3] pliers for removing and refitting hose clips 9029-T.
[4] union for venting fuel pressure 4192-T.
[5] hub immobilising tool 6310-T.
[6] ball-joint extractor 9040-TG1/TG2.
[7] hose clamp 4153-T.
2. Preliminary operations
Lift and support the vehicle with front wheels suspended.
Disconnect the battery.
Remove:
- The front wheels
- The front right mud guard
- The auxiliary equipment drive belt (see the relevant operation)
- The driveshaft nuts Using tool [5]
- The lower ball joints fixing nuts
- The drive shafts
Drain:
- The gearbox
- The cooling system
CAUTION: When connecting the tool [4], protect yourself with a cloth to guard against any projections of fuel.
The wiper arm nut (4).
3. Removing
3.1. TU1JP and TU3JP engines
Uncouple:
- The pipe At "a" and "b"
- Accelerator cable (4) (according to model)
- The fuel delivery hose
Remove:
- The air filter assembly (1)
- The battery (6) and its bracket (3)
Disconnect the connectors, then unclip and move aside the electrical harnesses adjacent to the engine.
Uncouple the unions, then detach and move aside the pipes adjacent to the engine.
Remove the radiator Using tool [3].
Uncouple:
- The hoses from the heater housing (5)
- The braking assistance pipe (6)
- The gearbox control rods Using tool [6]
- The gear control cables
- The clutch cable
Remove:
- The exhaust pipe (9)
- The (10) bolt
- The vibration damper (11)
- The mountings (8), (12)
- The reaction link (7)
Uncouple and blank the union at "c" on the power steering pump.
Remove the collar (14).
Uncouple and blank the union (13) Use tool [7].
Uncouple the air conditioning compressor (according to equipment).
Put lifting table [1] together with its supports [2] in position under the engine.
Clamp the engine-gearbox assembly using tools [1] and [2].
Remove:
- The (20) bolt
- The nuts (15) and (21)
- The engine mounting (19)
- The bolts (16)
- The nut (17)
- The flexible mounting (18)
- The power unit assembly
3.2. TU5JP4 engine
Remove:
- The catalytic converter (22)
- The bolts (26)
- The torque reaction attachment (25)
- The mountings (24)
- The reaction link (23)
Uncouple the air conditioning compressor (27).
Remove the radiator Using tool [3].
Attach the air conditioning condenser on the bodyshell.
Uncouple and plug the unions on the fuel high pressure pump Use tool [7].
Remove:
- The air filter assembly
- The battery and its bracket
Disconnect the connectors, then unclip and move aside the electrical harnesses adjacent to the engine.
Uncouple the unions, then detach and move aside the pipes adjacent to the engine.
Remove:
- The bolts (28)
- Accelerator pedal position sensor and flange assembly (29)
Uncouple:
- The heating unit hose assembly
- The braking assistance pipe
- The clutch cable
- The earth cable
Position the lifting table [1] and the supports [2].
Remove:
- The bolts (31)
- The nut (30)
- The nut (32)
- The bolts (33)
- The nut (34)
- The flexible mounting (35)
Gently lower the engine-gearbox assembly with the lifting bench.
CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell.
4. Refitting
Raise the vehicle.
Fit the engine/gearbox assembly Using tools [1] and [2].
Refit:
- The power unit assembly
- The engine mounting fixing screws
Disengage the tools [1] and [2].
Tighten the engine mounting brackets (see the relevant operation).
Refit:
- The reaction link
- The catalytic converter
- The air-conditioning compressor
- The accessories drive belt (see the relevant operation)
- The cooling radiator
Couple up:
- The heating unit hose assembly
- The braking assistance pipe
- The clutch cable
- The earth cable
Connect the connectors and electrical harnesses relating to the engine.
Clip the gear control ball-joints on the gearbox.
Refit:
- The exhaust clip
- The drive shafts (see the relevant operation)
- The front splash shields
- The front wheels
Fill the gearbox with oil (see the relevant operation).
Fill and bleed the engine cooling circuit (see the relevant operation).
Fill and bleed the power steering system (if necessary) (see the relevant operation).
ESSENTIAL: Always fit new Nylstop nuts.
Parts & tools for this job For 2002 Citroën Berlingo
- PARTEngine gasket setSearch: Citroën Berlingo 2002 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.