Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Wiring harnesses22 Instruments and warning lamps23 Locking, alarm and airbags24 Electrical - driver assistance systems25 Heating, air conditioning and audio
Citroën Berlingo (M59) Van Factory Workshop Manual (2002-2011)01 · Engine
01 · Engine

Dismantling - re-assembly: Engine - Gearbox

Make
Citroën
Model
Berlingo (M59) Van Factory Workshop Manual
Year
2002–2011
Section
Engine assembly › Dismantling - re-assembly: Engine - Gearbox
EngineDismantling - re-assembly: Engine - Gearbox

Dismantling - re-assembly: Engine - Gearbox

Citroën Berlingo (M59) Van · Removal-fitting · Ref. B1BG01A0P0

Applies to: 1.6 HDi 92 (DV6DTED m)

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Tooling

ToolReferenceDesignation
Figure e5ab0l7t
[9029-T]Pliers for removing elastic clips
Figure e5ab0ppt
[0172-Z]pliers for removing "clic" clips
Figure e5ag04kt
[5702-T.A]lifting bench
Figure e5ab0yst
[5704-T]engine support
Figure e5ag06wt
[4153-T]Set of clamps for 0 to 26 mm diameter connecting hoses
Figure e5ab0xst
[0194-T]plugs kit

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

Place the vehicle on a 2-post lift.

Remove the engine style cover.

Disconnect the battery negative terminal.

Drain:

  • The cooling system
  • The gearbox
Figure b1bp3cjd

Disconnect, plug and move aside the pipes (1) and (2); Using the tools [0194-T].

Place a hose clamp [4153-T] on the tube (7).

Disconnect, blank off and move aside; Using tool [0194-T]:

  • The power steering return pipe (7); Using tool [0172-Z]
  • The power steering rotary valve link pipe (8)
  • The radiator venting hose; Using tool [9029-T]
  • The upper hose (5) of the cooling radiator

Remove:

  • The lid of the engine compartment fusebox
  • The air ducts (3), (4) and (6)
  • The pre-heater unit
  • The engine management ECU and its support

Unplug:

  • The negative electric cable on the body
  • The positive electric cable
  • The engine harness connectors in the fuse box (Under bonnet)

2.1. Cable clutch control

Figure b1bg30ud

Disengage the clutch cable (9) from its support.

2.2. Hydraulic clutch control

Figure b1bg30vd

Remove the bolts (10).

Move aside the clutch slave cylinder (11) without opening the hydraulic circuit.

Unclip and move aside the relay unit.

Uncouple:

  • The pipes on the EGR electrovalve   (mark the locations of the pipes on the EGR electrovalve)
  • The vacuum pipe of the braking servo
  • The click-fit pipes of the heater assembly

2.3. Vehicle with air conditioning

Figure b1bg30wd

Disconnect the connector (at "a").

Remove:

  • The accessories drive belt (15)
  • The bolts (12)
  • The air-conditioning compressor (13)

Hang the air conditioning compressor (13) on the vehicle body.

2.4. Vehicles all types

Uncouple the pipe (14).

Figure c4ap1dfd

Remove:

  • The (19) bolt
  • The (21) bolt
  • The reaction link (20)
  • The front wheels
  • The engine subframe (18)
  • The drive shafts (16)
  • The exhaust hose (17)

Position the bottom of the front bumper at 85 cm from the ground.

Centre the lifting bench [5702-T.A] beneath the engine.

Lift the elevating platform [5702-T.A].

Secure the engine-gearbox assembly using tool [] in the following way; Using tool [5704-T]:

  • Clutch end for vehicles with and without air conditioning: One tool [5704-T] in the recess in the bearing cap cover and another tool [5704-T] positioned between the LH gearbox output and the bearing cap cover
  • Clutch end for vehicles with air conditioning: One tool [5704-T] in the recess in the bearing cap cover and tool [5704-T] fixed on one of the air conditioning compressor fixings
  • Clutch end for vehicles without air conditioning: Tool [5704-T] fixed on the bearing of the LH driveshaft and one tool [5704-T] under the oil sump fixing edge

Raise the lifting table [5702-T.A] slightly to place the engine-gearbox assembly under stress.

Figure b1bg30xd

Remove the 3 bolts   (at "b").

Figure b1bg30yd

Remove the nut (22).

Figure b1bg30zd

Lower the power unit assembly.

CAUTION: Ensure there is no interference between the engine-gearbox assembly and the vehicle.

Raise the vehicle.

Mark the location of the lifting table [5702-T.A] on the ground.

Move the engine-gearbox assembly away from under the vehicle.

3. Refitting

CAUTION: Adhere to the tightening torques.

Tightening torques:

Position the lifting bench [5702-T.A] with the engine-gearbox assembly at the marks made at removal.

Carefully lower the vehicle.

Position the front bumper 85 cm from the ground.

Lift the elevating platform.

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Figure b1bg310d

Engage the screw (23) in the gearbox support.

Refit the nut (22).

Remove the 3 bolts   (at "b").

Disengage the lifting bench [5702-T.A].

Refit:

  • The exhaust hose (17)
  • The drive shafts (16)
  • The engine subframe (18)
  • The front wheels
  • The reaction link (20)
  • The bolt (21)
  • The bolt (19)

Connect the hose (15).

3.1. Vehicle with air conditioning

Unclamp the air conditioning compressor (13).

Refit:

  • The air-conditioning compressor (13)
  • The bolts (12)
  • The accessories drive belt (15)

Connect the connector: (at "a").

3.2. Vehicles all types

Connect the cooling radiator bottom hose.

Lower the vehicle to the ground.

Couple up:

  • The heater matrix click-fit pipes (With new seals)
  • The vacuum pipe of the braking servo

Position and clip the relay unit.

Cable clutch control: Refit the clutch cable (9) on its support.

Hydraulic clutch control:

  • Reposition the clutch slave cylinder (11)
  • Refit the bolts (10)

Connect:

  • The positive electric cable
  • The engine harness connectors in the fuse box (Under bonnet)
  • The negative electric cable on the body

Refit:

  • The engine management ECU and its support
  • The pre-heater unit
  • The air ducts (3), (4) and (6)
  • The lid of the engine compartment fusebox
  • The upper hose (5) of the cooling radiator

Couple up:

  • The radiator venting hose; Using tool [9029-T]
  • The power steering rotary valve link pipe (8)
  • The power steering return pipe (7)

Remove the hose clamp [4153-T].

Couple up:

  • The tube (2)
  • The tube (1)

Refill:

  • The gearbox
  • The cooling system

Tighten:

  • The drive shafts
  • The wheels

Check the fluid levels:

  • For the power steering
  • The engine

Reconnect the battery negative terminal.

CAUTION: Perform the operations to be carried out following reconnection of the battery.

3.3. Vehicle with air conditioning

Check that the air conditioning system works properly.

3.4. Vehicles all types

Carry out:

  • A road test
  • A reading of the auto-diagnostic memories

Parts & tools for this job For 2002 Citroën Berlingo

As an Amazon Associate we earn from qualifying purchases.