Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Body - front section06 Body - rear section07 Front seats08 Electrical - general09 Starting and charging10 Heating, air conditioning and audio
Citroën BX Factory Workshop Manual (1982-1994)09 · Starting and charging
09 · Electrical

Check: Pre/post-heat circuit

Make
Citroën
Model
BX Factory Workshop Manual
Year
1982–1994
Section
Pre-heating › Check: Pre/post-heat circuit
Starting and chargingCheck: Pre/post-heat circuit

Check: Pre/post-heat circuit

Citroën BX · Checks · Ref. B1HD04P0

Applies to: Diesel fuel

1. Principles of operation

The post-heat time delay starts as soon as the starter is released (for 180 seconds).

During the first 15 seconds, the supply to plugs cannot be interrupted.

After 15 seconds, the supply to the heater plugs can be interrupted by: A coolant temperature above 60 °C.

2. Pre-heating system

Figure b1hp09vd

(1) Post-heating relay.

(2) Water thermal switch.

(3) Micro-switch on injection pump.

3. Check

Preliminary check: Battery voltage U Superior or equal to 12,5V.

Input
U1 ð U (battery voltage)No OKVerify: The continuity of the supply leads
Yes
Switch on the ignitionNo OKExchange: The post-heater control unit
Does the pre-heater warning lamp light up?: U2 > 10V
Yes
U2 > 10VYesU2 > 10VNo OKU2 = 0V
Coolant temperature < 60°: Check correctThe warning lamp stays on for 15 seconds after startingCoolant temperature > 60°: Check correct
No OK
Check the electrical connections of the sensorYesU2 = 0VNo OKCheckthe electrical connections of the relay
Replace the sensor (2)Coolant temperature < 60°: Does the relay (1) operate?Replace the relay (1)
Yes
Check the operation of the micro-switch, Replace the micro-switch if necessary

Parts & tools for this job For 1982 Citroën BX

As an Amazon Associate we earn from qualifying purchases.