Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Front doors and trim10 Lighting and signalling11 Front seats12 Electrical - general13 Starting and charging14 Heating, air conditioning and audio
Citroën C15 Factory Workshop Manual (1984-2005)01 · Engine
01 · Engine

Removing - refitting: Power unit

Make
Citroën
Model
C15 Factory Workshop Manual
Year
1984–2005
Section
Engine assembly › Removing - refitting: Power unit
EngineRemoving - refitting: Power unit

Removing - refitting: Power unit

Citroën C15 · Removal-fitting · Ref. B1BG4NP0

Applies to: DW8B diesel

1. Recommended tools

Figure e5-p03tc

[1] hub immobilising tool 6310-T.

Figure e5-p14uc

[2] pliers for removing plastic pegs 7504-T.

Figure e5ap1urc

[3] Pliers for spring clip 9029-T.

Figure e5ap1xvc

[4] lifting bench 5702-T.A.

Figure e5ap18gc

[5] filling cylinder.

Figure e5ap1tkc

[6] engine support 5704-T.

2. Removing

Disconnect the battery negative terminal.

Release the drive shaft nuts Using tool [1].

Raise and support the vehicle on a 2 -post lift.

Drain:

  • The cooling system
  • The gearbox
Figure b1bp2fwc

Remove:

  • The right-hand lower mud shield
  • The screws (2) and (4)
  • The reaction link (3)

Uncouple the pipe (1) Using tool [3].

Figure b2cp3fmc

Uncouple:

  • The exhaust clamp (5)
  • The gearbox control rods (6)
  • The pipe (7) Using tool [3]
Figure c4ap157d

Remove:

  • The screws (15) and (12)
  • The screws (14) and (13)
  • The bolts (9) (retrieve the washers and spacers)
  • The exhaust pipe

Position a lifting device to support the engine subframe (10).

Remove:

  • The (8) bolt
  • The (11) bolt

Uncouple the lower ball-joints.

Remove the engine subframe (10).

Keep the left hand drive shaft in the gearbox.

Uncouple the drive shafts from the steering pivots.

Uncouple and plug the engine coolant inlet pipe Using tool [3].

Secure the steering rack on the bodywork.

Figure b1bp2fxd

Remove:

  • The engine cover
  • The air filter (18) with the air inlet and outlet ducts
  • The battery (17)

Uncouple and close:

  • The pipe (19) Using tool [3]
  • The venting hoses (16)

The ecu connectors (20).

Figure b1bp2fyc

Unplug:

  • The 3 connectors (21)
  • The pre-heater unit (22)
  • The connector (23)
  • The positive supplies on the battery positive cable

Uncouple:

  • The speedometer cable (24)
  • The vacuum pipe of the braking servo
Figure b2cp3fnc

Release the clutch cable (27) from the clutch lever (26).

Unclip the clutch cable and move it away.

Release the electrical harnesses and secure them under the engine.

Disconnect the battery negative cable (25) from the gearbox.

Position the vehicle at a height of 60 cm (distance between the ground and the direction indicator).

Figure e5ap1xwc

Deploy the lifting bench [4] equipped with the tools [6] under the engine-gearbox assembly from the RH side of the vehicle.

Centralise the lifting table 4 under the engine/gearbox assembly.

Remove the handle "a" to finish positioning the lifting bench [4].

Figure b1bp2fzc

Lift the elevating platform [4].

Put a 4 cm wooden block between the lifting bench [4] and the gearbox.

Bring the rear engine mounting "b" and the gearbox into contact with the lifting bench [4].

Figure b1bp2g0d

Support the engine-gearbox assembly using the tools [6].

Figure b1bp2g1c

Uncouple and close:

  • The fuel supply pipe (29)
  • The fuel return pipe (30)

Remove:

  • The 3 bolts (28)
  • The nut (32)
  • The bracket (31)
Figure b1bp2g2c

Remove:

  • The battery carrier (33)
  • The nut (34)
Figure b1bp2g3d

Slowly lower the engine-gearbox assembly (using the lifting bench [4]).

N.B.: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Raise the vehicle.

At "c", mark the location of the lifting bench on the floor.

Refit the handle "a" to the lifting bench.

3. Refitting

Clamp:

  • The coolant circuit hoses (on the engine)
  • The electrical harnesses (on the engine)
  • The left hand driveshaft (on the gearbox)

Raise the vehicle.

Position the lifting bench [4] at the reference points "c".

Remove the handle "a" to finish positioning the lifting bench [4].

Position the vehicle at a height of 60 cm (distance between the ground and the direction indicator).

Figure b1bp2g4c

Lift the elevating platform [4].

N.B.: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Insert the bolt 35 in the bracket 36.

Refit:

  • The nut (34) Tighten to 6,5 ± 0,6 daN.m
  • The battery carrier (33)
Figure b1bp2g1c

Refit:

  • The bracket (31)
  • The 3 bolts (28) Tighten to 4,5 ± 0,5 daN.m
  • The nut (32) Tighten to 4,5 ± 0,5 daN.m

Couple up:

  • The fuel supply pipe (29)
  • The fuel return pipe (30)

Unclip:

  • The coolant hoses
  • The electrical harnesses

Lower lifting table [4].

Raise the vehicle.

Take away the lifting table [4].

Detach the steering rack from the bodyshell.

Refit the exhaust line.

Couple up:

  • The exhaust clamp (5)
  • The gearbox control rods (6)
  • The engine coolant inlet hose
  • The pipe (7)

Reposition and center the engine subframe (10) By means of a lifting tool.

Tighten bolts (14), (13), (11) and (8) by a few turns.

Reposition the drive shafts in the steering pivots.

Couple the lower ball-joints.

Refit the bolts (15) and (12).

Position the steering rack.

Fit the bolts (9).

Tighten:

  • The screws (14), (13), (11) and (8)
  • The screws (15) and (12)
  • The bolts (9)

Refit:

  • The reaction link (3)
  • The screws (2) and (4) Tighten to 5 ± 0,5 daN.m
  • The right-hand lower mud shield

Return the vehicle to its wheels.

Connect the battery negative cable (25) on the gearbox.

Position:

  • The electrical harnesses
  • The clutch cable (27)

Connect the clutch cable (27) to the clutch lever (26).

Couple up:

  • The vacuum pipe of the braking servo
  • The speedometer cable (24)
  • Accelerator cable (20)
  • The pipe (19)
  • The venting hoses (16)

Connect:

  • The positive supplies on the battery positive cable
  • The connector (23)
  • The pre-heater unit (22)
  • The 3 connectors (21)

Refit:

  • The battery (17)
  • The air filter (18) with the air inlet and outlet ducts
  • The engine cover

Connect the battery negative cable.

Refill and top up the cooling circuit (see the relevant operation).

Fill gearbox with oil and ensure correct level.

Check the oil level.

Tighten the driveshaft nuts.

Carry out:

  • A road test
  • A reading of the diagnostic memories

Parts & tools for this job For 1984 Citroën C15

As an Amazon Associate we earn from qualifying purchases.