Removing - refitting: timing belt
- Make
- Citroën
- Model
- C15 Factory Workshop Manual
- Year
- 1984–2005
- Section
- Timing gear › Removing - refitting: timing belt
Removing - refitting: timing belt
1. Recommended tools
[1] pliers for removing plastic pegs 7504-T.
[2] flywheel setting rod 7014-T.J.
[3] Injection pump setting pin Ø 6 (-).0188 H.
[4] bolts H M8 (-).0188 E.
[5] belt retaining clip (-).0188 K.
[6] belt tension adjusting square (-).0188 J1.
[7] Belt tension measuring tool with digital display (SEEM CTG 105.5 M).
2. Removing
Disconnect the battery negative terminal.
Raise and support the right-hand front of the vehicle.
Remove the front right-hand lower splash shield Using tool [1].
Unclip and move the cooling pipe away.
Remove:
- The accessories drive belt (see the relevant operation)
- The engine cover
Uncouple and close:
- The fuel supply pipe (2)
- The fuel return pipe (3)
Place the engine in a sling Using a workshop crane.
Remove:
- The nut (5)
- The bolts (1)
- The bracket (4)
Engage the 5th gear to allow the engine to be turned.
Remove:
- The screws (6), (7), (9), (15) and (16)
- The top cover (17)
- The intermediate cover (8)
CAUTION: Refit the screw (15) equipped with a washer (thickness 5 mm).
Remove:
- The 4 bolts (12)
- The pulley (13)
- The screws (11) and (14)
- The lower timing cover (10)
Rotate the front right hand wheel to drive the engine in the normal direction of rotation.
Bring the camshaft and injection pump drive pinions close to their setting valve.
Fit the peg [2] (from underneath the vehicle).
Continue to rotate the engine until the peg [2] engages into the flywheel.
Peg:
- The camshaft hub Using tool [4]
- The injection pump hub Using tool [3]
Unscrew:
- The screws (19) and (20)
- The bolt (23) of the roller tensioner (22)
Remove the timing belt.
3. Refitting
Tighten the screws (19) and (20) by hand.
Turn the sprockets (18) and (21), clockwise, to place them at the end of the slots.
Place the timing belt back on the crankshaft.
Retain the belt with the tool 5.
Fit the timing belt, strictly in the following order:
- The tensioning roller (24)
- Injection pump pinion (21)
- Camshaft gear wheel (18)
- The water pump pinion (25)
- The roller tensioner (22)
N.B.: If necessary, turn the sprockets (18) and (21) slightly anti-clockwise to engage the belt. The value of the angular displacement of the belt in relation to the sprockets must not exceed 1/2 tooth.
Remove the tool [5].
Turn the roller tensioner (22) by its square drive "a", using the tool [6], in order to check that the camshaft and injection pump pinions rotate freely.
Fit the belt tension measuring tool [7] on the belt section "b".
Using tool [6], turn at "a" in the opposite direction to rotation in order to obtain a tension of 106 ± 2 SEEM units.
Tighten:
- The bolt (23) of the roller tensioner (22)
- The screws (19) and (20)
Remove:
- The tool [7]
- The pegs [2], [3] and [4]
Turn the crankshaft 8 turns in the normal direction of rotation.
Peg:
- The flywheel Using tool [2]
- The camshaft hub Using tool [4]
- The injection pump hub Using tool [3]
Unscrew:
- The bolt (23) of the roller tensioner (22)
- The screws (19) and (20)
Fit the belt tension measuring tool [7] on the belt section "b".
Using tool [6], turn at "a" in the opposite direction to rotation in order to obtain a tension of 42 ± 2 SEEM units.
Tighten:
- The screw (23) to 2,1 ± 0,2 m.daN
- The bolts (19) to 2,3 ± 0,2 da.Nm
- The bolts (20) to 2,3 ± 0,2 da.Nm
Remove and refit equipment [7].
The tension value should be between 38 and 46 SEEM units.
Remove:
- The tool [7]
- The pegs [2], [3] and [4]
Turn the crankshaft 2 turns in the normal direction of rotation.
Peg the flywheel using the rod [2].
Check visually that the setting rods engage freely in the following components:
- Camshaft
- Injection pump
ESSENTIAL: Visually check that the offset between the holes of the injection pump and camshaft hubs and the corresponding peg locating holes, does not exceed 1 mm. If necessary, repeat the procedure for fitting the timing belt.
Remove:
- The peg [2]
- The bolt (15) and the washer
Refit:
- The lower timing cover (10)
- The intermediate cover (8)
- The top cover (17)
- The screws (11) and (14)
- The screws (6), (7), (9), (15) and (16)
- The pulley (13)
- The 4 bolts (12)
- The bracket (4)
- The nut (5): Tighten to 4,5 ± 0,5 daN.m
- The bolts (1): Tighten to 4,5 ± 0,5 daN.m
Withdraw the workshop lift.
Remove the plug and connect:
- The fuel supply pipe (2)
- The fuel return pipe (3)
Refit the engine style cover.
Reposition the coolant hose and clip it in.
Refit:
- The accessories drive belt (see the relevant operation)
- The right-hand lower mud shield
- The vehicle to its wheels
Disengage 5th gear.
Reconnect the battery negative terminal.
Parts & tools for this job For 1984 Citroën C15
- PARTTiming belt kitSearch: Citroën C15 1984 timing belt kit
- TOOLEngine timing tool setSearch: Citroën engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.