Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Locking, alarm and airbags23 Electrical - driver assistance systems24 Heating, air conditioning and audio
Citroën C1 Factory Workshop Manual (2005-2014)01 · Engine
01 · Engine

Removing - refitting: Engine and gearbox assembly

Make
Citroën
Model
C1 Factory Workshop Manual
Year
2005–2014
Section
Engine assembly › Removing - refitting: Engine and gearbox assembly
EngineRemoving - refitting: Engine and gearbox assembly

Removing - refitting: Engine and gearbox assembly

Citroën C1 · Removal-fitting · Ref. B1BG7CP0

Applies to: 1.4 HDi 54

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5a2002d

[1] Pliers for removing elastic clips 9029-T.

Figure e5a200zd

[2a] plugs kit (-).0194.T.

[2b] plugs kit (-).0194.E.

Figure e5a2010d

[3] lifting bench 5702-T.A.

Figure e5a2011d

[4a] engine support 5704-T.

[4b] engine support 5704-T.

Figure e5a200jd

[5] Tool for removing exhaust clip (C.0193-A).

Figure e5a2012d

[6] hub immobilising tool 6310-T.

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

Place the vehicle on a 2-post lift.

Disconnect the battery negative terminal.

Remove:

  • The engine cover
  • The scuttle (see the relevant operation)
  • The front wheels
  • The driveshaft nuts; Using tool [6]

2.1. Vehicle with air conditioning

Remove:

  • The bumper (see the relevant operation)
  • The air partition on the bumper frame

2.2. Removing (continued)

Drain:

  • The cooling system (see the relevant operation)
  • The gearbox (see the relevant operation)
Figure b1b200nd

Remove:

  • The air duct (4)
  • The nut on the positive terminal of the battery (1) and move aside the harness at "a"
  • The battery (3)
  • The fusebox unit cover (2)

Disconnect the negative cable on the body at "b".

Figure b1b200pd

Remove the positive terminal (5) protective cover.

Separate the positive terminal harness at "f".

Disconnect the engine harness at "c".

Move aside the fuse holder box (6).

Unclip and move aside the fusebox unit (6) harness.

Hook the fusebox unit (6) onto the bonnet strut at "d" by means of its hook at "e".

Unclip and move aside the electrical harnesses going to the battery tray (7).

Remove the battery tray (7).

Figure b1b200qd

Uncouple:

  • The gear engagement ball joint (11) (black reference)
  • The gear selection ball joint (12) (blue reference)
  • The clutch cable (10)

Remove the clips (9).

Move aside the cables.

CAUTION: Do not bend the cables. Position the cables on the sub-frame in such a way that they are not damaged when the engine is removed.

Disconnect the reversing lamps switch at "g".

Move aside the electrical harnesses attached to the gearbox.

Remove the air conduit (8).

Figure b1b200rd

Remove the cover (13).

Uncouple:

  • The heater matrix pipes (14) using the tool [1]
  • The vacuum pipe of the braking servo (at "k")
  • The fuel supply pipe (at "h")
  • The fuel return pipe (at "j")

Blank the pipes at "h" and at "j" using the tools [2a] and [2b].

Figure b1b200sd

Release the harness (17).

Remove:

  • The expansion bottle (18)
  • The (19) bolt

Unplug:

  • The connector at "l"
  • The 2 ECU connectors at "m"
  • The pre-heater unit (16)

Move aside the harness (15) on the engine.

Figure b1b200td

Slacken:

  • The bolts (20)
  • The bolts (21)
Figure c4a2009d

Move aside the left-hand mud flap (23).

Remove:

  • The drive shafts (see the relevant operation)
  • The clip (22) using tool [5]

Slacken:

  • The gearbox mounting bolt (24)
  • The engine mounting nut (26)

Remove the torque reaction link (25).

Figure b1j2009d

Remove:

  • The intermediate pipe hanger
  • The silencer hanger

Hang:

  • The silencer at "n"
  • The intermediate pipe at the front right wishbone

Remove the engine cooling radiator (see the relevant operation).

2.3. Vehicle with air conditioning

Figure c4a200ad

Protect the cooling condenser with cardboard.

Hang the condenser on the bumper frame.

Figure b1g200rd

Disconnect the air conditioning compressor connectors (at "p").

Remove:

  • The accessories drive belt (28) (see the relevant operation)
  • The bolts (27)

Move aside and suspend the air conditioning compressor on the side of the vehicle.

2.4. Removing (continued)

Figure c4a200bd

Place the vehicle at a height of 85 cm from the ground.

Position the lifting table [3] and the supports [4].

Clamp the engine:

  • A assembly - With air conditioning
  • B assembly - Without air conditioning
Figure b1b200ud

Remove:

  • The bolts (21)
  • The bolts (20)

N.B.: Ensure that the engine support does not become trapped in the intermediate mounting at "q".

Figure c4a200cd

Remove:

  • The nut (26)
  • The (24) bolt

Mark the location of the lifting table [3] on the ground.

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Remove the power train:

  • Lower the power unit by 8 centimetres (approx.)
  • Pivot the power unit on itself anticlockwise by 20°
  • Move the power unit 5 centimetres towards the front of the vehicle (remain in the continuation of the marks on the ground)

Lower lifting table [3].

N.B.: Ensure that the engine support does not become trapped in the intermediate mounting at "q".

Raise the vehicle.

Move the engine-gearbox assembly away from under the vehicle.

3. Refitting

Position the lifting table [3] with the engine-gearbox assembly.

N.B.: Position the lifting table in the continuation, 5 centimetres towards the front of the vehicle, with the engine pivoted 20° anticlockwise.

Carefully lower the vehicle.

Place the vehicle at a height of 85 cm from the ground.

Lift the elevating platform.

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Move the engine progressively to its initial position in the body; Align the marks made on removal with the position of the table.

N.B.: Ensure that the engine support does not become trapped in the intermediate mounting at "q".

Refit the bolts which secure the engine and gearbox mountings without tightening them.

Refit:

  • The reaction link (25); Tighten to 12 ± 2,4 daN.m
  • The exhaust pipe
  • The clip (22) using tool [5]

Tighten:

  • The screw (24) to 5,2 m.daN
  • The nut (26) to 5,2 m.daN

Refit:

  • The drive shafts (see the relevant operation)
  • The left-hand mud flap (23)

3.1. Vehicle with air conditioning

Unclamp the air conditioning compressor.

Refit:

  • The air-conditioning compressor
  • The bolts (27); Tighten to 4 ± 0,5 daN.m
  • The accessories drive belt (28) (see the relevant operation)

3.2. Vehicles all types

Refit the radiator (see the relevant operation).

Lower the vehicle to the ground.

Tighten:

  • The bolts (21)
  • The bolts (20)

Connect:

  • The 2 ECU connectors at "m"
  • The connector at "l"
  • The pre-heater unit (16)

Refit:

  • The harness bracket (15)
  • The expansion bottle (18)

Remove tools [2a] and [2b].

Couple up:

  • The vacuum pipe of the braking servo (at "h")
  • The engine supply pipe (at "f")
  • The fuel return pipe (at "g")
  • The heating radiator pipes (14) using the tool [1]

Refit:

  • The cover (13)
  • The air hose (8)

Refit the clutch cable (10).

Check the clutch clearance; Adjust (if necessary) (see the relevant operation).

Couple up:

  • The gear engagement ball joint (11) (black reference)
  • The gear selection ball joint (12) (blue reference)

Fit the clips (9).

ESSENTIAL: The smooth face of the gear engagement ball joints is fitted on the gear engagement plate side.

CAUTION: Do not bend the cables.

Clip the harnesses onto the battery tray (7).

Refit the battery tray (7).

Reconnect the earth cable at "b".

Connect the engine harness at "c".

Refit:

  • The fuse box (6)
  • The fusebox unit cover (2)
  • The battery (3)
  • The air hose (4)
  • The nut on the positive terminal of the battery (1)
  • The engine cover
  • The scuttle

Check the engine oil level.

Refill:

  • The gearbox (see the relevant operation)
  • The cooling system (see the relevant operation)

Operate the manual priming pump for 120 seconds to prime the fuel circuit.

Reconnect the battery negative terminal.

ESSENTIAL: Perform the operations to be carried out following reconnection of the battery (see the relevant operation).

3.3. Vehicle with air conditioning

Refit:

  • The air partition on the bumper frame
  • The bumper (see the relevant operation)

Check that the air conditioning system works properly.

3.4. Vehicles all types

Carry out:

  • A road test
  • A reading of the auto-diagnostic memories

Parts & tools for this job For 2005 Citroën C1

As an Amazon Associate we earn from qualifying purchases.