Removing - refitting: Engine and gearbox assembly
- Make
- Citroën
- Model
- C1 Factory Workshop Manual
- Year
- 2005–2014
- Section
- Engine assembly › Removing - refitting: Engine and gearbox assembly
Removing - refitting: Engine and gearbox assembly
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
[1] Pliers for removing elastic clips 9029-T.
[2a] plugs kit (-).0194.T.
[2b] plugs kit (-).0194.E.
[3] lifting bench 5702-T.A.
[4a] engine support 5704-T.
[4b] engine support 5704-T.
[5] Tool for removing exhaust clip (C.0193-A).
[6] hub immobilising tool 6310-T.
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Place the vehicle on a 2-post lift.
Disconnect the battery negative terminal.
Remove:
- The engine cover
- The scuttle (see the relevant operation)
- The front wheels
- The driveshaft nuts; Using tool [6]
2.1. Vehicle with air conditioning
Remove:
- The bumper (see the relevant operation)
- The air partition on the bumper frame
2.2. Removing (continued)
Drain:
- The cooling system (see the relevant operation)
- The gearbox (see the relevant operation)
Remove:
- The air duct (4)
- The nut on the positive terminal of the battery (1) and move aside the harness at "a"
- The battery (3)
- The fusebox unit cover (2)
Disconnect the negative cable on the body at "b".
Remove the positive terminal (5) protective cover.
Separate the positive terminal harness at "f".
Disconnect the engine harness at "c".
Move aside the fuse holder box (6).
Unclip and move aside the fusebox unit (6) harness.
Hook the fusebox unit (6) onto the bonnet strut at "d" by means of its hook at "e".
Unclip and move aside the electrical harnesses going to the battery tray (7).
Remove the battery tray (7).
Uncouple:
- The gear engagement ball joint (11) (black reference)
- The gear selection ball joint (12) (blue reference)
- The clutch cable (10)
Remove the clips (9).
Move aside the cables.
CAUTION: Do not bend the cables. Position the cables on the sub-frame in such a way that they are not damaged when the engine is removed.
Disconnect the reversing lamps switch at "g".
Move aside the electrical harnesses attached to the gearbox.
Remove the air conduit (8).
Remove the cover (13).
Uncouple:
- The heater matrix pipes (14) using the tool [1]
- The vacuum pipe of the braking servo (at "k")
- The fuel supply pipe (at "h")
- The fuel return pipe (at "j")
Blank the pipes at "h" and at "j" using the tools [2a] and [2b].
Release the harness (17).
Remove:
- The expansion bottle (18)
- The (19) bolt
Unplug:
- The connector at "l"
- The 2 ECU connectors at "m"
- The pre-heater unit (16)
Move aside the harness (15) on the engine.
Slacken:
- The bolts (20)
- The bolts (21)
Move aside the left-hand mud flap (23).
Remove:
- The drive shafts (see the relevant operation)
- The clip (22) using tool [5]
Slacken:
- The gearbox mounting bolt (24)
- The engine mounting nut (26)
Remove the torque reaction link (25).
Remove:
- The intermediate pipe hanger
- The silencer hanger
Hang:
- The silencer at "n"
- The intermediate pipe at the front right wishbone
Remove the engine cooling radiator (see the relevant operation).
2.3. Vehicle with air conditioning
Protect the cooling condenser with cardboard.
Hang the condenser on the bumper frame.
Disconnect the air conditioning compressor connectors (at "p").
Remove:
- The accessories drive belt (28) (see the relevant operation)
- The bolts (27)
Move aside and suspend the air conditioning compressor on the side of the vehicle.
2.4. Removing (continued)
Place the vehicle at a height of 85 cm from the ground.
Position the lifting table [3] and the supports [4].
Clamp the engine:
- A assembly - With air conditioning
- B assembly - Without air conditioning
Remove:
- The bolts (21)
- The bolts (20)
N.B.: Ensure that the engine support does not become trapped in the intermediate mounting at "q".
Remove:
- The nut (26)
- The (24) bolt
Mark the location of the lifting table [3] on the ground.
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Remove the power train:
- Lower the power unit by 8 centimetres (approx.)
- Pivot the power unit on itself anticlockwise by 20°
- Move the power unit 5 centimetres towards the front of the vehicle (remain in the continuation of the marks on the ground)
Lower lifting table [3].
N.B.: Ensure that the engine support does not become trapped in the intermediate mounting at "q".
Raise the vehicle.
Move the engine-gearbox assembly away from under the vehicle.
3. Refitting
Position the lifting table [3] with the engine-gearbox assembly.
N.B.: Position the lifting table in the continuation, 5 centimetres towards the front of the vehicle, with the engine pivoted 20° anticlockwise.
Carefully lower the vehicle.
Place the vehicle at a height of 85 cm from the ground.
Lift the elevating platform.
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Move the engine progressively to its initial position in the body; Align the marks made on removal with the position of the table.
N.B.: Ensure that the engine support does not become trapped in the intermediate mounting at "q".
Refit the bolts which secure the engine and gearbox mountings without tightening them.
Refit:
- The reaction link (25); Tighten to 12 ± 2,4 daN.m
- The exhaust pipe
- The clip (22) using tool [5]
Tighten:
- The screw (24) to 5,2 m.daN
- The nut (26) to 5,2 m.daN
Refit:
- The drive shafts (see the relevant operation)
- The left-hand mud flap (23)
3.1. Vehicle with air conditioning
Unclamp the air conditioning compressor.
Refit:
- The air-conditioning compressor
- The bolts (27); Tighten to 4 ± 0,5 daN.m
- The accessories drive belt (28) (see the relevant operation)
3.2. Vehicles all types
Refit the radiator (see the relevant operation).
Lower the vehicle to the ground.
Tighten:
- The bolts (21)
- The bolts (20)
Connect:
- The 2 ECU connectors at "m"
- The connector at "l"
- The pre-heater unit (16)
Refit:
- The harness bracket (15)
- The expansion bottle (18)
Remove tools [2a] and [2b].
Couple up:
- The vacuum pipe of the braking servo (at "h")
- The engine supply pipe (at "f")
- The fuel return pipe (at "g")
- The heating radiator pipes (14) using the tool [1]
Refit:
- The cover (13)
- The air hose (8)
Refit the clutch cable (10).
Check the clutch clearance; Adjust (if necessary) (see the relevant operation).
Couple up:
- The gear engagement ball joint (11) (black reference)
- The gear selection ball joint (12) (blue reference)
Fit the clips (9).
ESSENTIAL: The smooth face of the gear engagement ball joints is fitted on the gear engagement plate side.
CAUTION: Do not bend the cables.
Clip the harnesses onto the battery tray (7).
Refit the battery tray (7).
Reconnect the earth cable at "b".
Connect the engine harness at "c".
Refit:
- The fuse box (6)
- The fusebox unit cover (2)
- The battery (3)
- The air hose (4)
- The nut on the positive terminal of the battery (1)
- The engine cover
- The scuttle
Check the engine oil level.
Refill:
- The gearbox (see the relevant operation)
- The cooling system (see the relevant operation)
Operate the manual priming pump for 120 seconds to prime the fuel circuit.
Reconnect the battery negative terminal.
ESSENTIAL: Perform the operations to be carried out following reconnection of the battery (see the relevant operation).
3.3. Vehicle with air conditioning
Refit:
- The air partition on the bumper frame
- The bumper (see the relevant operation)
Check that the air conditioning system works properly.
3.4. Vehicles all types
Carry out:
- A road test
- A reading of the auto-diagnostic memories
Parts & tools for this job For 2005 Citroën C1
- PARTEngine gasket setSearch: Citroën C1 2005 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.