Removing - refitting: Engine/gearbox assembly (DV6ATED4)
- Make
- Citroën
- Model
- C3 Factory Workshop Manual
- Year
- 2002–2009
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (DV6ATED4)
Removing - refitting: Engine/gearbox assembly (DV6ATED4)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
[1] hub immobilising tool 6310-T.
[2] pliers for removing and refitting hose clips 9029-T.
[3] lifting bench 5702-T.A.
[4] engine supports 5704-T.
[5] set of two hose clamps 4153-T.
[6] plugs kit (-).0194/2.E.
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Chock and raise the vehicle on a 2 column lift.
Slacken the front wheel bolts.
Lift and support the vehicle.
Remove:
- The battery style cover
- The engine cover
Disconnect the battery.
Drain the cooling system (see the relevant operation).
Raise the vehicle (at mid-height).
Remove:
- The front wheels
- The front splash shields (see the relevant operation)
- The drive shafts (see the relevant operation)
- The accessories drive belt (see the relevant operation)
- The air duct (2)
- The engine injection ECU
- The battery tray (3)
Raise the vehicle.
Partially remove the exhaust pipe by disconnecting the catalytic converter.
Release the exhaust pipe.
Remove the engine subframe (see the relevant operation).
Uncouple and close:
- The venting hoses (1)
- The radiator top hose
- The exchanger outlet hose (5)
- The exchanger inlet hose (4)
2.1. Vehicle with air conditioning
Disconnect the connector "a".
Remove:
- The 3 bolts (7)
- The air conditioning compressor (6)
Suspend the air conditioning compressor on the left hand side of the vehicle.
2.2. Removing (continued)
Uncouple and close:
- The pipe (8)
- The lower radiator hose
Lower the vehicle close to ground-level.
Remove the earth wire secured to the chassis member.
Unplug:
- The engine harness
- The positive harness (engine fusebox)
- The earth lead (in the wheelarch)
Uncouple:
- The heater matrix inlet and outlet hoses
- The fuel pipes
- The expansion bottle venting hose
- The braking assistance pipe
Remove:
- The connectors of the cooling fan
- The 3 wiring harnesses on the pre-postheating unit (in the wheelarch)
- The fan unit (9)
- The 2 screws of the hydraulic clutch control (10)
Disconnect the clutch control (10).
Disconnect the rod (11).
Remove:
- The screws (12) and (15)
- The nut (14)
- The bracket (13)
Move the mounting (13) aside.
Position the vehicle at a height of 60 cm.
Centralise the lifting table 3 under the engine/gearbox assembly.
Remove the handle "b" to finish positioning the lifting bench [3].
Position then tighten the brackets [4] on the platform of the tool [3].
Remove:
- The 3 bolts (16)
- The 2 bolts (17)
Slowly lower the power unit Using tool [3].
N.B.: Make sure that there is no contact between the power unit and the body.
Raise the vehicle.
At "c", mark the location of the lifting bench on the floor.
Refit the handle "b" to the lifting bench.
3. Refitting
Raise the vehicle.
Position:
- The lifting table under the vehicle (to the marks made during removal)
- The vehicle has a height of 50 cm
Fit the engine/gearbox assembly Using tool [3].
CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell. If necessary move the engine-gearbox assembly to facilitate its repositioning.
Refit:
- The 2 bolts (17), Tighten to 6,1 ± 0,6 daN.m
- The 3 bolts (16), Tighten to 6 ± 0,6 daN.m
3.1. Vehicle with air conditioning
Reposition the air conditioning compressor (6).
Refit the 3 bolts (7).
Reconnect the connector "a".
3.2. Refitting (continued)
Refit:
- The bracket (13)
- The nut (14)
- The 2 screws (12) and (15)
Couple up:
- The push rod (11)
- The hydraulic clutch control (10)
Refit:
- The 2 screws of the hydraulic clutch control (10)
- The fan unit (9)
Reconnect:
- The connectors of the cooling fan
- The 3 wiring harnesses on the pre-postheating unit (in the wheelarch)
- The earth wire on the gearbox
Couple up:
- The pipe (8)
- The radiator top hose
- The exchanger outlet hose (5)
- The exchanger inlet hose (4)
Lower the vehicle close to ground-level.
Refit the earth wire on the chassis member.
Couple up:
- The heater matrix inlet and outlet hoses
- The lower radiator hose
- The venting hoses (1)
Reconnect:
- The engine harness
- The positive harness (engine fusebox)
- The earth lead (in the wheelarch)
Couple up:
- The fuel pipes
- The braking assistance pipe
Raise the vehicle.
Refit:
- The engine subframe (see the relevant operation)
- The exhaust pipe
- The battery tray (3)
- The engine injection ECU
- The air duct (2)
- The accessories drive belt (see the relevant operation)
- The drive shafts (see the relevant operation)
- The front splash shields (see the relevant operation)
- The front wheels
Fill and bleed the cooling system (see the relevant operation).
Reconnect the battery.
ESSENTIAL: Perform the operations to be carried out following reconnection of the battery (see the relevant operation).
Refit:
- The battery style cover
- The engine cover
Return the vehicle to its wheels.
Check that the air-conditioning is working correctly.
Carry out:
- A road test
- A reading of the diagnostic memories
Parts & tools for this job For 2002 Citroën C3
- PARTEngine gasket setSearch: Citroën C3 2002 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.