Removing - refitting: timing belt (TU3JP/TU1JP/TU5JP4)
- Make
- Citroën
- Model
- C3 Factory Workshop Manual
- Year
- 2002–2009
- Section
- Timing gear › Removing - refitting: timing belt (TU3JP/TU1JP/TU5JP4)
Removing - refitting: timing belt (TU3JP/TU1JP/TU5JP4)
ESSENTIAL: Respect the precautions to be taken before repair (refer to the brochure: "RECOMMENDATIONS - PRECAUTIONS").
1. Recommended tools
[1] flywheel locking tool 4507-T.A.
[2] camshaft gear setting rod 4507-T.B.
[3a] 4533-T.AC1 camshaft setting rod.
[3b] 4533-T.AC2 camshaft setting rod.
[4] pin for the dynamic roller tensioner 4200-T.H.
[5] belt retaining clip 4533-T.AD.
[6] pliers for removing plastic pegs 7504-T.
2. Preliminary operations
Lift and support the vehicle with front wheels suspended.
Disconnect the battery.
Remove:
- The front right wheel
- The front right mud guard, Using tool [6]
- The auxiliary equipment drive belt (see the relevant operation)
- The crankshaft pulley
- The oil filter
Place a jack under the engine, support the engine.
3. Removing
3.1. TU1JP and TU3JP engines
Turn over the engine clockwise using the crankshaft pinion bolt (1), until the timing position is reached.
Remove the timing cases.
Peg the camshaft gear wheel using the rod [2].
Peg the flywheel using the rod [1].
Remove:
- The bolts (2)
- Upper right-hand engine support (3)
Unscrew the bolts (4) without removing them.
Remove the lower engine mounting assembly (5) and fixing screws (4).
Unscrew nut (6).
Slacken the belt fully by acting on the roller tensioner (7).
Remove the timing belt.
ESSENTIAL: Check that the roller tensioner turns freely (no tight spot).
3.2. TU5JP4 engine
Remove:
- The bottom timing cover
- The engine mounting (9)
- The intermediate mounting
- The timing cover (8)
Peg the flywheel using the rod [1].
Fit tools [3a] and [3b].
Slacken the roller tensioner.
Turn the dynamic roller tensioner so as to be able to position the tool (4) With the aid of an Allen key placed at "a".
Turn the roller tensioner towards the right to bring the index "c" to position "b".
Peg the roller tensioner in this position in order to loosen the timing belt to the maximum.
ESSENTIAL: Never turn the dynamic roller tensioner around completely.
Remove the timing belt.
Check that the rollers turn freely (no tight spot).
4. Refitting
4.1. TU1JP and TU3JP engines
N.B.: Check that the setting rods [1] [2] are in place.
CAUTION: Observe the fitting direction of the belt: The arrows "d" show the direction rotation of the crankshaft.
Refit the timing belt.
Position the timing belt, span "e" correctly tightened, in the following order:
- Crankshaft gear Retain the belt with the tool 5
- Camshaft pulley
- Water pump pulley
- Roller tensioner
Remove setting rods [1]and [2].
4.2. TU5JP4 engine
Fit the timing belt, strictly in the following order:
- Intake camshaft pulley
- Exhaust camshaft pulley
- Roller tensioner
- Crankshaft pulley
- Fit the tool [5]
- Water pump pulley
- Dynamic roller tensioner
Remove tools [1], [3]and [5].
4.3. Excess belt tension
A: TU1JP and TU3JP engines.
B: TU5JP4 engine.
Rotate the roller tensioner (7) using an Allen key (at "a").
Position the index "c" in position "f" Tension the belt to the maximum of the space indicated.
Hold the roller tensioner (7) Using tool [4].
Tighten the roller tensioner fixing nut to 1 m.daN.
Turn the crankshaft 4 turns in the normal direction of rotation.
ESSENTIAL: Never turn the crankshaft backwards.
Reinsert setting rods [1], [2] and [3] to make sure that the timing setting is correct.
Remove setting rods [1], [2]and [3].
4.4. Adjusting the tension
A: TU1JP and TU3JP engines.
B: TU5JP4 engine.
Loosen the nut while maintaining the position of the roller tensioner Using an Allen key at "a".
Then bring the index "c" to its adjustment position "g".
CAUTION: The index "c" must not go past the slot "g". If it does, repeat the timing belt tensioning operation.
Hold the roller tensioner (7) in this position, using an Allen key.
Tighten the roller tensioner fixing nut to 2 ± 0,2 m.daN (TU1JP and TU3JP engines).
Tighten the roller tensioner fixing nut to 2,2 ± 0,2 m.daN (TU5JP4 engines).
ESSENTIAL: The tensioning roller must not turn while its mounting is tightened. If it does, repeat the timing belt tensioning operation.
5. Refitting (continued)
Refit the engine mounting assembly.
Remove the jack from under the engine.
Refit:
- The oil filter
- The timing housings
- The crankshaft pulley
- The auxiliary equipment drive belt (see the relevant operation)
- The front right mud guard
- The front right wheel
Return the vehicle to its wheels.
Parts & tools for this job For 2002 Citroën C3
- PARTTiming belt kitSearch: Citroën C3 2002 timing belt kit
- TOOLEngine timing tool setSearch: Citroën engine timing tool set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
As an Amazon Associate we earn from qualifying purchases.