Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Body - roof and headlining12 Body shell13 Lighting and signalling14 Wipers and washers15 Fascia and interior panels16 Front seats17 Rear seats18 Electrical - general19 Starting and charging20 Instruments and warning lamps21 Locking, alarm and airbags22 Electrical - driver assistance systems23 Heating, air conditioning and audio
Citroën C3 Pluriel Factory Workshop Manual (2003-2010)01 · Engine
01 · Engine

Removing - refitting: Engine/gearbox assembly (TU3A)

Make
Citroën
Model
C3 Pluriel Factory Workshop Manual
Year
2003–2010
Section
Engine assembly › Removing - refitting: Engine/gearbox assembly (TU3A)
EngineRemoving - refitting: Engine/gearbox assembly (TU3A)

Removing - refitting: Engine/gearbox assembly (TU3A)

Citroën C3 Pluriel · Removal-fitting · Ref. B1BG7NP0

Applies to: 1.4 i 75 (TU3A)

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5-p01uc

[1] lifting bench 5702-T.A.

Figure e5ap22lc

[2] engine support 5704-T.

Figure e5ap1urc

[3] pliers for removing and refitting hose clips 9029-T.

Figure e5ap22mc

[4] union for venting fuel pressure 4192-T.

Figure e5-p05fc

[5] hub immobilising tool 6310-T.

2. Removing

Lift and support the vehicle with front wheels suspended.

Disconnect the battery.

Remove:

  • The front wheels
  • The front right mud guard
  • The auxiliary equipment drive belt (see the relevant operation)
  • The driveshaft nuts Using tool [5]
  • The lower ball joints fixing nuts
  • The drive shafts

Drain:

  • The gearbox
  • The cooling system

CAUTION: When connecting the tool [4], protect yourself with a cloth to guard against any projections of fuel.

The wiper arm nut (4).

Figure b1bp2nfd

Remove:

  • The air filter assembly (4)
  • The ECU (5)
  • The battery (6) and its bracket

Uncouple:

  • The pipe (3)
  • The canister electrovalve (1)
  • Accelerator cable (2) (according to model)
  • The fuel delivery hose

Disconnect the connectors, then unclip and move aside the electrical harnesses adjacent to the engine.

Uncouple the unions, then detach and move aside the pipes adjacent to the engine.

Remove:

  • Bonnet locking (7)
  • The engine cooling radiator, Using tool [3]
Figure c5hp18zc

Remove the circlips (8).

Uncouple:

  • The hoses from the heater housing (9)
  • The braking assistance pipe
  • The hydraulic clutch control cylinder

Uncouple:

  • The gearbox control rods
  • The gear control cables
  • The earth cable
Figure b1jp041c

Remove:

  • The securing bolts (10)
  • The reaction link (11)
  • The exhaust pipe (12)
  • The exhaust manifold
  • The alternator harness protection sleeve
  • The alternator

Uncouple the air conditioning compressor (according to equipment).

Put lifting table [1] together with its supports [2] in position under the engine.

Figure b1bp2ngd

Clamp the engine-gearbox assembly using tools [1] and [2].

Figure b1bp2nhd

Remove:

  • The bolts (13)
  • The bolts (14)
  • The power unit assembly

Gently lower the engine-gearbox assembly with the lifting bench.

CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell.

3. Refitting

Raise the vehicle.

Fit the engine/gearbox assembly, Using tools [1] and [2].

Refit:

  • The power unit assembly
  • The engine mounting fixing screws

Disengage the tools [1] and [2].

Tighten the engine mounting brackets (see the relevant operation).

Refit:

  • The reaction link
  • The catalytic converter
  • The air-conditioning compressor
  • The accessories drive belt (see the relevant operation)
  • The exhaust manifold

Couple up:

  • The click-fit pipes of the heater assembly
  • The hydraulic clutch control cylinder
  • The fuel delivery hose

Clip the gear control cables on the gearbox.

Refit:

  • The exhaust clip
  • The drive shafts (see the relevant operation)
  • The front splash shields
  • The front wheels

Fill gearbox with oil and ensure correct level (see the relevant operation).

Fill and bleed the engine cooling circuit (see the relevant operation).

Check all the levels.

Always fit new Nylstop nuts.

Parts & tools for this job For 2003 Citroën C3 Pluriel

As an Amazon Associate we earn from qualifying purchases.