Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Wiring harnesses23 Instruments and warning lamps24 Locking, alarm and airbags25 Electrical - driver assistance systems26 Heating, air conditioning and audio
Citroën C4 Factory Workshop Manual (2004-2010)01 · Engine
01 · Engine

Removing - refitting: Cylinder head (on vehicle) (DW10BTED4)

Make
Citroën
Model
C4 Factory Workshop Manual
Year
2004–2010
Section
Cylinder head › Removing - refitting: Cylinder head (on vehicle) (DW10BTED4)
EngineRemoving - refitting: Cylinder head (on vehicle) (DW10BTED4)

Removing - refitting: Cylinder head (on vehicle) (DW10BTED4)

Citroën C4 · Removal-fitting · Ref. B1DG5ZP0

Applies to: 2.0 HDi 138 particle emission filter

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5-p05ec

[1] lifting bracket 2517-T.Bis.

Figure e5ap051c

[2] lifting bracket 149-T.

Figure e5ap03qc

[3] adaptor for angular tightening 4069-T.

Figure e5ap17sc

[4] plugs kit (-).0188.T.

2. Removing

Remove:

  • The engine cover
  • The battery style cover

Disconnect the battery negative terminal.

Disconnect the connector of the flowmeter.

Remove:

  • The air filter with the air flow sensor
  • The fuel filter
  • The fuel filter support

Drain the cooling system (see the relevant operation).

Figure b1bp35gd

Remove:

  • The turbocharger air inlet duct
  • The engine degassing tube
  • The EGR hose
  • The camshaft position sensor
  • The intake cylinder head cover
  • The EGR valve with the heat exchanger (see the relevant operation)
  • The pre-heater plugs supply shunt
  • The diesel injectors (see the relevant operation)
  • The vacuum pump (see the relevant operation)
  • The fuel high pressure pump (see the relevant operation)
  • The battery
  • The battery support
  • The auxiliary equipment drive belt (see the relevant operation)
  • The timing belt (see the relevant operation)
  • The camshafts (see the relevant operation)

Disconnect the pipes (2).

Remove:

  • The nuts (4)
  • The thermostat (3)
  • The (1) bolt
Figure b1dp1kpc

Remove:

  • The valve control rockers with their hydraulic followers (6)
  • The chain pad (5)
  • The fuel high pressure common injection rail (see the relevant operation)

CAUTION: Mark the position of the followers and rockers.

Fit the tool [1] Using a workshop crane.

Tension the equipment 1.

Remove the right-hand engine mounting.

Figure b1ep1ghc

Remove the bolts (7).

Refit the right-hand engine mounting.

Figure b1dp14sc

Remove:

  • The cylinder head bolts (order from 1 to 10)
  • The cylinder head
  • The cylinder head gasket

N.B.: If necessary, Tilt and detach the cylinder head using the levers [2].

3. Cleaning to be carried out just before refitting

CAUTION: Clean the gasket faces with an approved descaling product. Do not use a cutting or abrasive tool. The gasket faces must not have any traces of knocks or scores.

Clean out with a tap the threads in the crankcase which accommodate the cylinder head screws (M12 x 150 tap).

Brush the threads of the cylinder head bolts.

4. Check

Check the flatness of the cylinder head: Maximum permissible bow = 0,03 mm.

Check the length of the cylinder head bolts.

Figure b1dp15ec

Length below the head X = 134,5 mm.

5. Refitting

N.B.: Check that the cylinder head to cylinder block centring pegs are in place as "a".

Fit a new cylinder head gasket.

Figure b1dp1kqc

Refit the cylinder head gasket.

CAUTION: Position the reference holes "b" of the cylinder head gasket at the oil filter end.

Position the pistons at mid-stroke.

Refit:

  • The cylinder head
  • The cylinder head bolts

5.1. Cylinder head tightening

Figure b1dp05bc

ESSENTIAL: Follow the tightening sequence (order from 1 to 10).

Tightening procedure:

  • Pre-tighten to 2,2 ± 0,2 daN.m
  • Tighten to 6 ± 0,5 daN.m
  • Untighten by 1 turn (order from 10 to 1)
  • Tighten to 6 ± 0,5 daN.m
  • Angular tighten to 220 ± 5 ° Using tool [3]

5.2. Refitting (continued)

Refit:

  • The bolts (7)
  • The chain pad (5)
  • The valve control rockers with their hydraulic followers (6) (respect the marks made on removal)
  • The camshafts (see the relevant operation)
  • The fuel high pressure common injection rail (see the relevant operation)
  • The diesel injectors (see the relevant operation)
  • The timing belt (see the relevant operation)
  • The accessories drive belt (see the relevant operation)
  • The fuel filter support
  • The fuel filter (complete)
  • The (1) bolt
  • The thermostat (3) (equipped with new seals)
  • The nuts (4)
  • The vacuum pump

Join the hoses (2).

Refit:

  • The fuel high pressure pump
  • The pre-heater plugs supply shunt
  • The EGR valve with the heat exchanger (see the relevant operation)
  • The intake cylinder head cover
  • The EGR hose
  • The tube

N.B.: EGR: exhaust gas recycling device.

Refit:

  • The turbocharger air inlet duct
  • The air filter with the air flow sensor

Recouple the connector on the flow meter.

Fill and bleed the following components:

  • The cooling system
  • The fuel filter

Reconnect the battery negative terminal.

Refit:

  • The engine cover
  • The protective panel under the engine

Parts & tools for this job For 2004 Citroën C4

As an Amazon Associate we earn from qualifying purchases.