Removing - Refitting: turbocharger (DW10ATED)
- Make
- Citroën
- Model
- C4 Factory Workshop Manual
- Year
- 2004–2010
- Section
- Turbocharging › Removing - Refitting: turbocharger (DW10ATED)
Removing - Refitting: turbocharger (DW10ATED)
ESSENTIAL: Observe the safety and cleanliness recommendations.
CAUTION: Do not separate the pressure regulation valve from the turbocharger or slacken its fixings.
1. Recommended tools
[1] tool for unclipping ball joints diameter 10 mm (-).0216-G 1.
[2] tool for unclipping ball joints diameter 13 mm (-).0216-G2.
2. Removing
Disconnect the battery.
Lift and support the vehicle.
Remove:
- The protective panel under the engine
- The catalytic converter (/) (See the corresponding operation)
Remove:
- The reaction link (1)
- The turbocharger air pipe (2)
- The steering rack heat shield (3)
Uncouple: The gear selection rods (4); Using the tools [1], [2].
N.B.: The rods (4) must be uncoupled in order to tilt the engine.
CAUTION: Close the lubrication ducts and the oil return ducts on the turbocharger and the engine.
Remove:
- The securing clip 5
- The banjo bolt (6)
- The (7) bolt (/)
Uncouple: The lubrication return pipe (as "a").
Remove:
- The 3 nuts (9)
- The turbocharger (8)
N.B.: The turbocharger is removed by tilting the engine forwards.
3. Check
Examine the engine air filtering system.
Ensure that the oil circuit unions are clean.
Check that no foreign bodies are present:
- In the air intake circuit
- In the exhaust gas manifold (Risk of damage to the turbocharger when it cuts in)
4. Refitting
CAUTION: Clean the gasket faces with an approved descaling product. Do not use abrasives or sharp tools on the joint faces. The seal faces should not show any traces of impacts or scratches.
4.1. Assembly: turbocharger
CAUTION: Always replace all removed seals.
CAUTION: Always replace: The nuts (9); The bolts (11), (14).
Tightening torques (Case of replacement of the turbocharger):
- Bolts (14): 2,3 ± 0,69 daNm
- Banjo bolt (10): 2,75 ± 0,27 daNm
- Bolts (11): 1 ± 0,1 daNm
4.2. Refitting (Continued)
CAUTION: Pre-fit the components of the turbocharger, in order to adjust their position (Before final tightening).
Refit:
- The turbocharger (/)
- The 3 nuts (9); Tighten to 2,5 ± 0,2 daN.m
- The lubrication union on the cylinder block; Tighten the banjo bolt (6) to 4 ± 0,4 daNm
- The securing clip 5
- The bolts (/); Tighten to 2,3 ± 0,69 daN.m
- The bolt + nut assembly (13); Tighten to 2,3 ± 0,69 daN.m
- The turbocharger inlet air connector
- The (7) bolt (/)
Couple up:
- The lubrication return pipe (as "a")
- The selector linkages (4) (-speed); Using the tools [1], [2]
Refit:
- The steering rack heat shield (3)
- The turbocharger air pipe (2)
Refit:
- The reaction link (1)
- The (15) bolt (/); Tighten to 5,4 ± 0,8 daN.m
- The bolt (16); Tighten to 3,9 ± 0,3 daN.m
Refit:
- The catalytic converter (/) (See the corresponding operation)
- The protective panel under the engine
Reconnect the battery.
5. Precautions to be taken before starting the vehicle
Disconnect the camshaft position sensor connector.
Turn the engine over using the starter until the oil pressure warning light switches off.
Connect: The camshaft position sensor connector.
Let the engine run at idle for 30 seconds before increasing the load.
After switching on, check the sealing of the various unions.
Clear the faults in the memory; Using the diagnostic equipment.
Parts & tools for this job For 2004 Citroën C4
- PARTEngine gasket setSearch: Citroën C4 2004 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.