Removing - refitting: Engine/gearbox assembly (EW7A)
- Make
- Citroën
- Model
- C4 Picasso Factory Workshop Manual
- Year
- 2006–2013
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (EW7A)
Removing - refitting: Engine/gearbox assembly (EW7A)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
[1] union for venting fuel pressure 4192-T.
[2] lifting bench 5702-T.A.
[3a] Engine mounting with reversible tool (-).0005.
[3b] engine supports.
[3c] engine support (-).0005-C.
[4] Tool for removing exhaust clips (-).0193-A.
2. Removing
Raise the vehicle and support on axle stands, wheels free.
CAUTION: After switching off the ignition, wait 15 minutes before disconnecting the battery (to guarantee that the initialisations of the various ECUs are memorised).
Disconnect the battery.
Drain:
- The cooling system (see the relevant operation)
- The gearbox
- The engine (if necessary)
Remove:
- The front wheels
- The front bumper (see the relevant operation)
- The front splash shields (see the relevant operation)
- The engine cover
- The air filter casing (5)
- The engine fuse box cover (1)
- The oil filler duct (4)
Unplug:
- The engine fuse box connector (2)
- The engine ecu
Remove the engine fuse box supply wire (3).
Push into "a" Then slide the fusebox unit (6) forwards.
Move aside the fuse holder box (6).
Remove:
- The supply wire (8)
- The battery style cover (7)
- The battery
Remove:
- The 6 mountings (9)
- The battery carrier
Uncouple:
- The click-fit pipes of the heater assembly (11)
- The radiator upper hose ()
- The vacuum pipe (10)
Connect the tool [1] to the fuel supply circuit bleed valve and collect the petrol in a receptacle.
ESSENTIAL: When uncoupling the petrol supply clickfit hose, use a cloth to protect yourself from any projections of fuel (residual pressure in the injection rail is approx. 1 bar).
Move aside the fuel supply clickfit hose (12).
Disconnect the canister discharge electrovalve connector (at "b").
Uncouple the canister discharge electrovalve pipe (13).
Remove the clutch slave cylinder (14).
Move aside the clutch slave cylinder - pipe assembly.
Remove the gear control cables (15).
Disconnect the connectors (at "c").
CAUTION: Clamp the air conditioning compressor to a body component without opening the air conditioning circuit.
Remove:
- The accessories drive belt (see the relevant operation)
- The alternator (see the relevant operation)
- The engine cooling radiator (see the relevant operation)
- The air-conditioning compressor (Without opening the air conditioning circuit)
Disconnect and unclip the downstream oxygen sensor.
Remove:
- The intermediate exhaust pipe (see the relevant operation)
- The drive shafts (see the relevant operation)
- The front sub-frame (see the relevant operation)
- The exhaust hose (16); Using tool [4]
- The pre-catalyst outlet pipe (17); Using tool [4]
Remove:
- The (19) bolt
- The bolts (18)
- The impact absorber ()
Place the vehicle at a height of 50 cm from the ground.
Position the lifting table [2] with its pivoting platform, underneath the engine-gearbox assembly via the front of the vehicle.
Lift the elevating platform [2].
Support the engine-gearbox assembly using the tools [3a], [3b].
Position:
- The tools [3b] in the recess holes of the cylinder block (at "d")
- The tool [3c] fixed on the gearbox casing (at "e")
- The tool [3a] on the lower torque reaction rod (at "f")
Raise the lifting table [2] slightly to place the engine-gearbox assembly under stress.
Remove:
- The bolts (20), (21)
- The RH engine support assembly
Remove:
- The earth wire (22) on the body
- The nuts (24)
- The nut (23)
- The gearbox mounting pad
Bring the engine-gearbox assembly as far forward as possible towards the front of the vehicle.
Slowly lower the lifting table [2].
Ensure that there is no fouling between the engine-gearbox assembly and the body.
Manoevre the engine-gearbox assembly to facilitate removal.
Raise the vehicle.
Mark the location of the lifting table on the ground.
Move the engine-gearbox assembly away from under the vehicle.
3. Refitting
Raise the vehicle.
Position:
- The lifting table under the vehicle (to the marks made during removal)
- The vehicle has a height of 50 cm
Lift the elevating platform [2].
CAUTION: Make sure there is no contact between the engine-gearbox assembly and the engine subframe and bodyshell; Manoevre the engine-gearbox assembly to facilitate its repositioning.
Reposition the engine-gearbox assembly opposite its upper fixings.
Refit:
- The gearbox mounting
- The 2 nuts (24); Tighten to 3 ± 0,3 daN.m
- The nut (23); Tighten to 6,5 ± 0,6 daN.m
- Upper right-hand engine support
- The bolts (21); Tighten to 6 ± 0,6 daN.m
- The bolts (20); Tighten to 6 ± 0,6 daN.m
Withdraw the lifting table from under the vehicle.
Refit:
- The impact absorber ()
- The (19) bolt; Tighten to 6 ± 0,9 daN.m
- The bolts (18); Tighten to 4 ± 0,6 daN.m
- The air-conditioning compressor
- The alternator (see the relevant operation)
- The engine cooling radiator (see the relevant operation)
- The clutch slave cylinder
- The gear control cables
CAUTION: Adjust the gear control cables (see the relevant operation).
Refit the ancillary belt (see the relevant operation).
Reconnect the connectors (at "c").
Couple up:
- The fuel supply clickfit hose (12)
- The vacuum pipe (10)
- The click-fit pipes of the heater assembly (11)
Refit:
- The front sub-frame (see the relevant operation)
- The drive shafts (see the relevant operation)
- The intermediate exhaust pipe (see the relevant operation)
Reconnect:
- The earth wire (22) on the body
- The engine fuse box supply (3)
- The engine fuse box connector (2)
- The engine ecu
Reconnect and clip the downstream oxygen sensor.
Refit:
- The battery carrier
- The mountings
- The battery
- The supply wire (8)
- The battery style cover (7)
- The air filter casing (5)
- The engine cover
- The front splash shields (see the relevant operation)
- The front bumper (see the relevant operation)
- The front wheels; Tightening to 10 ± 1 daN.m
Fill and bleed the cooling system (see the relevant operation).
Top up to level:
- The gearbox
- The engine (if necessary)
Reconnect the battery.
CAUTION: Perform the operations to be carried out following reconnection of the battery (see the relevant operation).
Check the functioning of the air conditioning.
Road test the vehicle.
Parts & tools for this job For 2006 Citroën C4 Picasso
- PARTEngine gasket setSearch: Citroën C4 Picasso 2006 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.