Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Interior trim20 Electrical - general21 Starting and charging22 Wiring harnesses23 Locking, alarm and airbags24 Electrical - driver assistance systems25 Heating, air conditioning and audio
Citroën C4 Picasso Factory Workshop Manual (2006-2013)01 · Engine
01 · Engine

Check: Setting the valve timing (DV6TED4)

Make
Citroën
Model
C4 Picasso Factory Workshop Manual
Year
2006–2013
Section
Timing gear › Check: Setting the valve timing (DV6TED4)
EngineCheck: Setting the valve timing (DV6TED4)

Check: Setting the valve timing (DV6TED4)

Citroën C4 Picasso · Checks · Ref. B1ED3PP0

Applies to: 1.6 HDi 110 particle emission filter (DV6TED4)

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5ap3a3d

[1] flywheel locking tool (-).0194.C.

[2]   Camshaft probe (-).0194.B.

[3] crankshaft setting rod (-).0194.A.

[4]   High pressure fuel pump drive pulley immobilising rod (-).0194.A.

Figure e5ap3a4d

[5]   plugs kit (-).0188.T.

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

Put the vehicle on a hoist.

Disconnect the battery.

Remove the engine style cover.

Figure b1ep1umd

Uncouple and move aside the pipes (1)   (at "a"); Plug by means of the tool [5].

Remove:

  • The front right wheel
  • The front right mud guard   (see the relevant operation)
  • The accessories drive belt   (see the relevant operation)
Figure b1ep1ued

Remove the front intermediate exhaust pipe   (see the relevant operation).

Position the flywheel locking tool [1] in the crankshaft main bearing cap casing setting hole.

Turn the engine in the normal direction of rotation until the peg [1] engages in the setting hole.

Figure b1ep1und

Move aside the electrical harness (5).

Remove:

  • The top timing cover (4)
  • The (6) bolt
  • The pulley (2)
  • The lower timing cover (/) (3)

Refit bolt (6).

Remove the tool [1].

3. Check

3.1. Visual check

CAUTION: Carry out the checks below.

Check that the timing belt is free of cracks and traces of oil.

Check the absence of oil leaks (crankshaft and camshaft sealing rings).

Check the absence of coolant fluid leaks   (coolant pump).

Check that the track of the engine speed sensor target () is not damaged or scratched.

Replace any defective parts.

3.2. Checking the valve timing

Figure b1ep1upd

CAUTION: The magnetic track should carry no sign of damage and should not be approached by any other magnetic source; Otherwise, replace the crankshaft pulley.

Turn the crankshaft through 6 revolutions clockwise using the screw (6).

CAUTION: Never turn back.

Peg:

  • The crankshaft; Using tool [3]
  • The camshaft; Using the pin [2]   (oil the peg)
  • The high pressure fuel pump drive pulley; Using tool [4]   (oil the peg)

CAUTION: If it is impossible to peg the camshaft, check that the offset between the camshaft pulley hole and the pegging hole is not greater than 1 mm; If this is not the case, repeat the cambelt fitting procedure   (see the relevant operation).

Figure b1ep1uqd

Check the positioning of the index (7).

N.B.: The dynamic roller tensioner index (7) must be centred in the gap "b".

CAUTION: If it does, repeat the timing belt tensioning operation   (see the relevant operation).

Remove the tools [2], [3], [4].

4. Refitting

Figure b1ep1urd

Refit tool [1].

Remove bolts (6).

Refit:

  • The lower timing cover (3)
  • The pulley (2)

Fit the bolt (6)   (new).

Tightening of the bolt (6):

  • Pre-tighten to 3,4 ± 0,4 daN.m
  • Angular tightening 190° ± 5°

CAUTION: When the angle is reached, check that the tightening torque of the bolt is between 8 and 16 m.daN.

Remove the tool [1].

Refit:

  • The top timing cover (4)
  • The electrical harness (5)

N.B.: Use new plastic tie wraps.

Continue the fitting operations in the reverse order to removal.

Reconnect the battery.

CAUTION: Perform the operations to be carried out following reconnection of the battery.

Operate the manual priming pump several times to prime the fuel circuit.

Parts & tools for this job For 2006 Citroën C4 Picasso

As an Amazon Associate we earn from qualifying purchases.