Removing - Refitting: turbocharger (EP6DT)
- Make
- Citroën
- Model
- C4 Picasso Factory Workshop Manual
- Year
- 2006–2013
- Section
- Turbocharging › Removing - Refitting: turbocharger (EP6DT)
Removing - Refitting: turbocharger (EP6DT)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Removing
ESSENTIAL: Wait at least one hour before carrying out any work on the exhaust line.
Disconnect the battery.
Place the vehicle on a two-post ramp.
CAUTION: Fit blanking plugs in the openings of the turbocharger.
Remove the air conduit (1).
Disconnect the supply (2) from the turbocharger.
Remove: The banjo bolts (4), (5), (6).
Release:
- The lubrication inlet pipe (7) of the turbocharger
- The cooling outlet pipe (3) of the turbocharger
Remove the fixing bolt (9) of the cooling inlet pipe of the turbocharger.
Uncouple: The turbocharging pressure regulation valve pipe (10).
Move aside the cooling inlet pipe (8) of the turbocharger.
Remove:
- The bolts (11), (12)
- The turbocharger mounting (13)
- The fixing bolt (14) of the lubrication return pipe (15) of the turbocharger
Disconnect the lubrication return pipe (15) from the turbocharger.
Remove:
- The bolts (16)
- The heat shield (17)
Remove:
- The banjo bolt (18)
- The lubrication inlet pipe (7) of the turbocharger
Remove:
- The mounting nuts (19)
- The turbocharger (20) and exhaust manifold assembly (21)
Remove the exhaust manifold seal (22).
Remove the securing nuts (23) from the exhaust manifold ().
Split:
- The exhaust manifold (21)
- The turbocharger (20)
- Seal (24)
2. Refitting
CAUTION: At refitting, all the removed seals must be replaced with new seals.
Assemble:
- The exhaust manifold (18)
- Seal (24) (New)
- The turbocharger (20)
- The nuts (23); Tighten to the specified torque
Refit:
- The exhaust manifold seal (22) (new)
- The turbocharger (20) and exhaust manifold assembly (21)
- The mounting nuts (19); Tighten to the specified torque
Position: The lubrication inlet pipe (7) of the turbocharger (With a new seal).
Refit: The banjo bolt (18).
Position a 9 mm diameter rod (at "a") (To torque tighten the socket screw (18)).
Tighten to the specified torque.
Refit:
- The heat shield (17)
- The bolts (16); Tighten to the specified torque
Couple up: The lubrication return pipe (15) from the turbocharger.
Refit:
- The fixing bolt (14) of the lubrication return pipe (15) of the turbocharger
- The turbocharger mounting (13)
- The bolts (11), (12)
Tighten to the specified torque.
Position: The cooling entry pipe (8) of the turbocharger.
Couple up: The turbocharging pressure regulation valve pipe (10).
Refit but do not tighten fixing bolt (9) of the cooling inlet pipes (8) of the turbocharger.
Position: The cooling outlet pipe (3) of the turbocharger.
Position: The lubrication inlet pipe (7) of the turbocharger.
Refit: The banjo bolts (5), (4), (6).
Position a 12 mm diameter rod (at "b") (To torque tighten the socket screw (6)); Tighten to the specified torque.
Reconnect supply (2) to the turbocharger.
Refit:
- The air duct (1)
- The catalytic converter (/)
CAUTION: Perform the operations to be carried out following reconnection of the battery.
Reconnect the battery.
Parts & tools for this job For 2006 Citroën C4 Picasso
- PARTEngine gasket setSearch: Citroën C4 Picasso 2006 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.