Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Wiring harnesses22 Instruments and warning lamps23 Locking, alarm and airbags24 Electrical - driver assistance systems25 Heating, air conditioning and audio
Citroën C5 (X7) Factory Workshop Manual (2008-2017)01 · Engine
01 · Engine

Check: Setting the valve timing (ES9A)

Make
Citroën
Model
C5 (X7) Factory Workshop Manual
Year
2008–2017
Section
Timing gear › Check: Setting the valve timing (ES9A)
EngineCheck: Setting the valve timing (ES9A)

Check: Setting the valve timing (ES9A)

Citroën C5 (X7) · Checks · Ref. B1ED010MP0

Applies to: 3.0i V6 24V 211 (ES9A)

ESSENTIAL: Observe the safety and cleanliness recommendations.

ESSENTIAL: If raising the vehicle on a lift, wheels hanging, remove the cap of the LDS fluid reservoir. Refit the cap of the LDS fluid reservoir, once you have lowered the vehicle.

1. Recommended tools

Figure e5am0jvd

[1] crankshaft setting rod (-).0187.A.

Figure e5am0jwd

[2] locating pin for checking the valve timing (-).0187.C.

Figure e5ap38xd

[3] union for venting fuel pressure 4192-T.

2. Removing

Disconnect the battery.

Support the engine using a workshop crane   (right hand side).

Figure b1bm132d

Remove the engine style cover (3).

Drop the pressure in the fuel supply circuit:

  • Couple the tool [3] on the valve SCHRAEDER (1)
  • Collect the fuel in a container

Unclip:

  • The pipe (2)
  • The fuel pipes (4)

Uncouple and move aside the fuel piping (4).

Remove the power steering tube fixing lugs   (at "a" and "b").

Figure b1bm133d

Remove: The expansion chamber (8) nut (7).

Release the expansion chamber (8).

Remove:

  • The upper torque reaction link (5)
  • The right-hand engine mounting (6)
  • The auxiliary equipment drive belt
Figure b1bm134d

Remove:

  • The power steering pump pulley
  • The dynamic tensioner (11)
  • The crankshaft pulley (12)
  • The top timing cover (9)
  • The top timing cover (10)
  • The lower timing cover (13)
Figure b1em09rd

Lock the crankshaft using the rod [1].

Figure b1em09sd

Check that the tool [2] can be passed freely through the pulleys and into the cylinder heads.

N.B.: The pegs [1] and [2] should engage without forcing.

CAUTION: If engagement of the pegs proves difficult, repeat the timing belt removal-refitting operation.

Remove tools [1] and [2].

3. Refitting

Refit:

  • The lower timing cover (13)
  • The top timing cover (10)
  • The top timing cover (9)
  • The crankshaft pulley (12)
  • The dynamic tensioner (11)
  • The power steering pump pulley
  • The accessories drive belt
  • The right-hand engine mounting (6)
  • The upper torque reaction link (5)
  • The expansion bottle (8)
  • The expansion chamber (8) nut (7)
  • The power steering pipe fixing clips   (at "a" and "b")

Couple up - Release: The fuel pipes (4).

Clip:

  • The pipe (2)
  • The fuel pipes (4)

Refit the engine style cover (3).

CAUTION: Perform the operations to be carried out following reconnection of the battery.

Reconnect the battery.

Parts & tools for this job For 2008 Citroën C5

As an Amazon Associate we earn from qualifying purchases.