Removing - Refitting: Gear lever
- Make
- Citroën
- Model
- C5 (X7) Factory Workshop Manual
- Year
- 2008–2017
- Section
- Gearbox controls › Removing - Refitting: Gear lever
Removing - Refitting: Gear lever
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Removing
Put the vehicle on a hoist.
Disconnect the battery.
Remove:
- The protective panel under the engine
- The exhaust front flexible pipe
- The exhaust flexible mounting nuts (On the front subframe)
- The protectors under the body
Move aside and clip the exhaust line ().
Remove the front exhaust heat shield.
Remove the central console.
Disconnect the connectors (at "a").
Remove the seal (1).
Remove:
- The nuts (3)
- The gear lever (2) (from underneath the vehicle)
2. Refitting
CAUTION: Adhere to the tightening torques.
Refit:
- The gear lever (2)
- The nuts (3)
- Seal (1)
Reconnect the connectors (at "a").
Refit:
- The centre console
- The exhaust front heat shield
Put the exhaust line in place.
Refit:
- The exhaust flexible mounting nuts (On the front subframe)
- The protectors under the body
- The exhaust front flexible pipe
- The protective panel under the engine
- The vehicle to its wheels
CAUTION: Perform the operations to be carried out following reconnection of the battery.
Reconnect the battery.
3. Additional operation
If the gear selector is replaced, the gear control counter must be reset to zero; Using the diagnostic equipment.
Parts & tools for this job For 2008 Citroën C5
- PARTClutch kitSearch: Citroën C5 2008 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Citroën C5 manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.