Removing - Refitting: Turbo pressure regulator pneumatic control
- Make
- Citroën
- Model
- C6 Factory Workshop Manual
- Year
- 2005–2012
- Section
- Turbocharging › Removing - Refitting: Turbo pressure regulator pneumatic control
Removing - Refitting: Turbo pressure regulator pneumatic control
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Removing
CAUTION: After the ignition has been switched off: Wait 15 minutes before disconnecting the battery to ensure that the programmed values of the various ECUs are stored.
Disconnect the battery.
Chock and lift the vehicle on a 2 column lift.
Remove the under engine protection.
Remove:
- The reaction link rod cooling duct (1)
- The stabiliser bar (2) under the engine subframe
Loosen the clips (3), (4).
Remove bolts (5).
Remove the clip (7).
Uncouple the pipe (6).
Remove:
- The (8) bolt
- The air outlet duct (9)
Remove:
- The bolts (11)
- The air outlet end piece (10)
- The 3 gearbox control support (12) fixing nuts
Move aside the gearbox control support (12).
Remove the clip (13); Using thin long-nose pliers.
Move aside the control rod (14).
Remove the nuts (15).
Raise and disengage the turbocharger pressure regulation control (16) from its support detaching its lower fixing "b" from its support.
Turn the turbocharger pressure regulation control (16) slightly to its left (Gearbox end).
Disengage the turbocharger pressure regulation control (16) upper fixing "a" from the support.
Lower the turbocharger pressure regulation control (16) slightly.
Uncouple the pipe at "c" marking its position in relation to the turbocharger pressure regulation control (16).
2. Refitting
Couple the pipe on the turbocharger pressure regulation control (16) at "c" (In relation to the mark made on removal).
Reposition the turbocharger pressure regulation control (16) on its support, engaging the lower fixing "b" first.
Turn the turbocharger pressure regulation control (16) slightly to its right (timing side).
Engage the turbocharger pressure regulation control (16) upper fixing "a" on its support.
Fit the nuts (15).
N.B.: Ensure that the turbocharger pressure regulation control (16) sits perfectly flush on its support.
Do up the nuts (15) by hand.
Tighten the nuts (15) to 0,8 dan.m.
Reposition: The control rod (14).
Tighten the clips (13) (new); Using thin long-nose pliers (As indicated above).
Refit the clips (13).
Verify:
- The locking of the clips (13)
- The positioning of the pipe (18)
- Manoeuvre the valve (17) manually three times and check that the rod (14) moves freely and without any points of resistance
Reposition the gearbox control support (12).
Refit:
- The 3 gearbox control support (12) fixing nuts
- The air outlet end piece (10) (With a new seal)
- The bolts (11)
- The air outlet duct (9)
- The (8) bolt
- The (5) bolt
Re-tighten: The clips ((4), (3)).
Connect the pipe (6).
Refit:
- The clip (7)
- The stabiliser bar (2) under the engine subframe
- The reaction link rod cooling duct (1)
- The protective panel under the engine
Lower the vehicle to the ground.
Reconnect the battery.
Carry out:
- A road test
- A reading of the diagnostic memories
Parts & tools for this job For 2005 Citroën C6
- PARTEngine gasket setSearch: Citroën C6 2005 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.