Removing - refitting: Engine/gearbox assembly (BVM6, DW12BTED4)
- Make
- Citroën
- Model
- C8 Factory Workshop Manual
- Year
- 2002–2014
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (BVM6, DW12BTED4)
Removing - refitting: Engine/gearbox assembly (BVM6, DW12BTED4)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [1] | [/] hub immobilising tool | 6310-T | (-).0006-AY |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [2] | [/] pliers for removing and refitting hose clips | 9029-T | (-).0165 |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [3] | Lifting table with accessories | 5702-T.A | (-). 0004 |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [4a] | Engine mounting with reversible tool | 5704-T | (-).0005 |
| [4b] | [/] engine support | 5704-T | (-).0005 |
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Disconnect the battery.
Slacken the front wheel bolts.
Chock and raise the vehicle on a 2 column lift.
Remove:
- The engine cover
- The protective panel under the engine
Drain:
- The engine cooling system
- The gearbox (manual gearbox)
Disconnect the battery.
Disconnect the connector (at "a").
Remove:
- The handle (1)
- The scuttle manifold (3)
- The vehicle’s jack (5)
- The air filter (6) with the air flow sensor
- The air duct (4)
- The venting unit (2)
- The screen wiper mechanism
Detach and move aside:
- The fuel supply pipe (12) with the priming pump (11)
- The fuel return pipe (13)
Unclip and move aside: The fans relay (9).
Detach and move aside; Using tool [2]:
- The pipe (8)
- The pipe (10)
Protect the engine cooling radiator; Using cardboard.
Remove the engine cooling radiator (7).
Raise: The lug "b".
Unclip: The screenwash reservoir filler tube mounting bracket (14).
N.B.: Slide the mounting bracket (14) towards the engine cooling radiator.
Release: The mounting bracket (14) and the screenwash reservoir filler tube (16).
Remove: The engine fusebox cover (15).
Remove the nut (18).
Uncouple: The positive cable (19).
Disconnect the connector (as "c").
Pull back the electrical harness ((17) fuse box under bonnet).
Clip the electrical harness (on the engine).
Remove the clip (23).
Uncouple:
- The gearbox controls (22)
- The pipe (21)
- The brake servo tube (20)
Detach and move aside: The heater matrix pipe (24).
Remove the 3 mountings (Engine ECU (25)).
Release; Raise: The engine management ECU (25).
Disconnect and move aside:
- The connector "d"
- The connector "e"
- The connector "f"
Uncouple: The earth lead (26).
Unclip and move aside: The engine electrical harness (27) (With the engine management ECU (25)).
Clamp: The engine electrical harness (25) (on the engine).
Disconnect the connector (as "g").
Unclip and move aside the electrical harness (28).
Remove the clip (30).
Detach and move aside; Close: The tube (29).
Slacken the driveshafts; Using tool [1].
Raise the vehicle.
Remove the accessories drive belt (34).
Disconnect the connector (as "h").
Remove the 3 fixings (33) from the air conditioning compressor (32).
Suspend the air conditioning compressor (32) on the vehicle body.
Uncouple the air duct (31).
Remove:
- The clip (37)
- The (35) bolt
Uncouple the air duct (36).
Loosen the clips (38) and (39).
Remove:
- The (41) bolt
- The air outlet duct (42)
- The exhaust clip (40)
- The exhaust pipe and particle filter assembly ()
Remove:
- The fixing (43)
- The fixing (44)
- The reaction link (45)
- The front wheels
- The engine subframe
- The drive shafts
Place the vehicle at a height of 50 cm from the ground.
Centralise the lifting table 3 under the engine/gearbox assembly.
Lift the elevating platform [3].
Clamp the engine-gearbox assembly using tools [4a] and [4b].
N.B.: Position the tools [4b] in the recessed holes in the cylinder block (as "j").
Place the support [4a] in the right-hand drive shaft bearing.
Raise the lifting table [3] slightly to place the engine-gearbox assembly under stress.
Remove:
- The bracket (48) (Fuel priming pump)
- The securing bolts (47) (RH engine support (46))
Uncouple - Release: The earth cable (49).
Remove:
- The screws (51) and (54)
- The nut (50)
Slowly lower the engine and gearbox assembly; Using tool [3].
Detach: The stud (52) (LH engine support (53)).
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Manoevre the engine-gearbox assembly to facilitate removal.
Raise the vehicle.
Move aside the front splash shields.
Mark the location of the lifting table on the ground.
Move the engine-gearbox assembly away from under the vehicle.
3. Refitting
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
Raise the vehicle.
Position:
- The lifting bench [3] under the vehicle (to the marks made during removal)
- The vehicle has a height of 50 cm
Lift the elevating platform [3].
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body. Manoevre the engine-gearbox assembly to facilitate its repositioning.
Position the engine-gearbox assembly facing its upper fixings.
Engage the left-hand engine mounting (53) in the stud (52).
Refit:
- The nut (50)
- The screws (51) and (54)
Reposition: The right-hand engine mounting (46) (On its centring pin).
Refit the bolts (47).
Tighten:
- The nut (50) to 5,5 ± 0,5 daN.m
- Screws (51) and (54) to 5,5 ± 0,5 m.daN
- The bolts (47) to 6 ± 0,5 daN.m
Withdraw the lifting bench [3] from under the vehicle.
Refit:
- The drive shafts
- The engine subframe
- The front wheels
- The lower torque reaction link (45)
- The fixing (44)
- The fixing (43)
Tighten:
- The fixing (44) to 8,7 ± 0,8 m.daN
- The fixing (43) to 3,9 ± 0,2 m.daN
Refit:
- The exhaust pipe and particle filter assembly ()
- The exhaust clip (40); Tightening to 2,5 ± 0,2 daN.m
- The dual turbocharger under engine air outlet duct (42)
- The (41) bolt; Tighten to 6 ± 0,6 daN.m
Tighten hose clips (38) and (39).
Recouple: The air duct (36).
Refit:
- The (35) bolt; Tighten to 0,8 ± 01 daN.m
- The clip (37)
Recouple: The air duct (31).
Reposition the air conditioning compressor (32).
Refit:
- The bolts (33); Tighten to 2,8 ± 0,3 daN.m
- The accessories drive belt (34)
Reconnect the connector (as "h").
Lower the vehicle.
Tighten: The drive shafts; Using tool [1].
Reposition; Recouple the tube (29).
Refit the clip (30).
N.B.: Bleed the hydraulic clutch control circuit.
Reposition; Reclip the electrical harness (28).
Reconnect the connector (as "g").
Unclamp; Reposition; Refasten: The engine electrical harness (27) (With the engine management ECU (25)).
Recouple: The earth lead (26).
Reposition; Reconnect:
- The connector "/" (as "f")
- The connector "/" (as "e")
- The connector "/" (as "d")
Reposition; Fix: The engine management ECU (25).
Recouple: The heater matrix pipe (24).
Recouple:
- The brake servo (20) tube (/)
- The pipe (21)
- The gearbox controls
Unclamp; Reposition the electrical harness in the fuse box under the bonnet.
Recouple: The positive cable (19).
Refit the nut (18).
Reconnect the connector (as "c").
Refit: The engine fusebox cover (15) (17).
Reposition: The mounting bracket (14) and the screenwash reservoir filler tube (16).
Refasten: The bracket (14).
Refit the engine cooling radiator (7).
Recouple; Using tool [2]:
- The pipe (10)
- The pipe (8)
Reposition: The fans relay (9).
Refit the support (48) (Fuel priming pump (11)).
Reposition; Recouple:
- The fuel return pipe (13)
- The fuel supply pipe (12) with the priming pump (11)
Refit:
- The screen wiper mechanism
- The venting unit (2)
- The air duct (4)
- The air filter with the air flow sensor (6)
- The vehicle’s jack (5)
- The scuttle manifold (3)
- The handle (1)
- Reconnect the connector (as "a")
- Fill and top up the gearbox oil
Fill and bleed the cooling system.
Check the brake fluid level.
Refit:
- The protective panel under the engine
- The wheels
- The engine cover
- The vehicle on the ground
Tighten the wheel bolts.
Check the functioning of the air conditioning.
Carry out:
- A road test
- A reading of the diagnostic memories
Parts & tools for this job For 2002 Citroën C8
- PARTEngine gasket setSearch: Citroën C8 2002 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.