Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Wiring harnesses22 Instruments and warning lamps23 Locking, alarm and airbags24 Electrical - driver assistance systems25 Heating, air conditioning and audio
Citroën C8 Factory Workshop Manual (2002-2014)01 · Engine
01 · Engine

Removing - refitting: turbocharger (DW10UTED4)

Make
Citroën
Model
C8 Factory Workshop Manual
Year
2002–2014
Section
Turbocharging › Removing - refitting: turbocharger (DW10UTED4)
EngineRemoving - refitting: turbocharger (DW10UTED4)

Removing - refitting: turbocharger (DW10UTED4)

Citroën C8 · Removal-fitting · Ref. B1HGH8P0

Applies to: 2.0 HDi 120

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Recommended tools

Figure e5-p088c
DesignationReferenceReference
[1] pliers for removing "clic" clips4145-T(-).0172-Z

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

ESSENTIAL: Do not separate the pressure regulation valve from the turbocharger or slacken its fixings.

Disconnect the battery negative terminal.

Remove:

  • The windscreen wiper mechanism (see the relevant operation)
  • The right hand driveshaft (see the relevant operation)
Figure b1bp3ndd

Disconnect the connector (at "a").

Remove:

  • The engine cover
  • The air filter (1) box
Figure b1bp3ned

Disconnect the connector (at "b").

Remove:

  • The tube (2)
  • The exhaust gas recycling duct (3)
Figure b1bprphd

Disconnect the connector (at "c").

Remove the fixing screws (4).

Move aside the turbocharging pressure regulation electrovalve (5).

Remove:

  • The nut (7)
  • The heat shield (6)
  • The air duct (9)

Uncouple the pipe (8).

Figure b1bprpjd

Remove:

  • The pre-catalytic converter (11) (see the relevant operation)
  • The air duct (10)
Figure b1bprpkd

Remove:

  • The bolts (13)
  • The nuts (14)
  • The nut (18)
  • The turbocharger oil supply pipe (16) (on the engine)
  • The turbocharger oil return pipe (15) (on the engine)

Unscrew:

  • The (12) bolt
  • The turbocharger fixing (17)
Figure b1bprpld

Move aside the exhaust gas recycling electrovalve and exhaust gas/coolant heat exchanger assembly (19) (Without opening the cooling system).

Remove:

  • The (21) bolt (from above the vehicle)
  • The nuts (20) (from underneath the vehicle)

Tilt the turbocharger (22) towards the rear and lift it.

Remove the turbocharger (22) (from underneath the vehicle).

CAUTION: Close the lubrication ducts and the oil return ducts on the turbocharger and the engine.

3. Refitting

N.B.: Always replace seals which have been removed.

CAUTION: Check the absence of foreign bodies in the air ducts when refitting.

Fit the turbocharger (22) (from underneath the vehicle).

Reposition the turbocharger (22) (In the lower support).

Tilt the turbocharger (22) (towards the front).

Refit:

  • The nuts (20) (from underneath the vehicle)
  • The (21) bolt (from above the vehicle)

Tighten:

  • Screw (21) to 2,5 ± 0,2 daNm
  • The nuts (20) to 2,5 ± 0,2 daN.m

Replace the exhaust gas recycling electrovalve and exhaust gas/coolant heat exchanger assembly (19).

Tighten:

  • The turbocharger fixing (17); Tightening to 3 ± 0,2 daN.m
  • Screw (12) to 0,7 ± 0,1 daNm

Refit:

  • The bolts (13); Tightening to 0,8 ± 0,1 daN.m
  • The nut (18); Tightening to 3 ± 0,3 daN.m
  • The nuts (14); Tightening to 0,7 ± 0,1 daN.m
  • The turbocharger oil return pipe (15) (on the engine)
  • The turbocharger oil supply pipe (16) (on the engine); Tightening to 4 ± 0,4 daN.m
  • The air duct (10)
  • The pre-catalytic converter (11) (see the relevant operation)

Connect the pipe (8).

Refit:

  • The air duct (9)
  • The heat shield (6)
  • The nut (7)

Reposition the turbocharging pressure regulation electrovalve (5).

Refit the fixing screws (4).

Reconnect the connector (at "c").

Refit:

  • The exhaust gas recycling duct (3)
  • The tube (2)

Reconnect the connector (at "b").

Refit:

  • The air filter (1) box
  • The engine cover

Reconnect the connector (at "a").

Refit:

  • The windscreen wiper mechanism (see the relevant operation)
  • The right hand driveshaft (see the relevant operation)

Reconnect the battery negative terminal.

Parts & tools for this job For 2002 Citroën C8

As an Amazon Associate we earn from qualifying purchases.