Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Wiring harnesses22 Locking, alarm and airbags23 Electrical - driver assistance systems24 Heating, air conditioning and audio
Citroën C-Crosser Factory Workshop Manual (2007-2012)01 · Engine
01 · Engine

Removing - refitting: Engine/gearbox assembly

Make
Citroën
Model
C-Crosser Factory Workshop Manual
Year
2007–2012
Section
Engine assembly › Removing - refitting: Engine/gearbox assembly
EngineRemoving - refitting: Engine/gearbox assembly

Removing - refitting: Engine/gearbox assembly

Citroën C-Crosser · Removal-fitting · Ref. B1BG0117P0

Applies to: 2.4 i mmc EURO4 or 2.0 i mmc EURO4 or 2.4 i mmc EURO5

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Tooling

toolReferenceDesignation
Figure e5ab0wzt
[0199-D]lifting brackets
Figure e5ab05kt
[0004]lifting bench
Figure e5ab0x1t
[0005-C]
[0005-G]
special support

2. Removing

Figure b1bm0mcd

Remove:

  • The engine cover
  • The engine fuse box (4) cover

Release the pressure in the fuel circuit:

  • Remove fuse F23 from the engine fuse box (as "b")
  • Start the engine for a few minutes to drain the fuel circuit

Disconnect the battery.

Remove:

  • The air hose (1)
  • The air filter housing (2) and air duct assembly
  • The battery (3)

Uncouple: The fuel pipe click-fit union (as "a").

ESSENTIAL: When uncoupling the fuel pipe (at "a"), use a cloth to protect yourself from any splashes of fuel.

CAUTION: Plug the supply pipes and the fuel injection rail; Using plugs.

Figure b1bm0pmd

Remove the accessories drive belt.

Disconnect the connector (as "c").

Remove:

  • The (5) bolt
  • The bolt (6)
  • The earth cable (9)
  • The 3 bolts (8)
  • The power steering pump (7)

Move aside the power steering pump.

Raise the vehicle and support on axle stands, wheels free.

Remove the protectors under the engine.

Drain the cooling system.

Drain the gearbox.

Drain the engine oil.

Figure b1bm0med

Remove:

  • The 2 nuts (10)
  • The earth cable (11)
  • The bracket (12) (Electrical harness)
Figure b1bm0mfd

Unclip: The earth cable (16).

Remove:

  • The earth cable (16)
  • The mounting lug (13) (Engine management ECU support)
  • The bolts (17) (Engine management ECU support)
  • Move the mounting aside

Unplug:

  • The connector (15) (Engine ECU)
  • The 2 connectors (14) (Engine fuse box)
Figure b1bm0mgd

Remove the screws (20) of the bracket (19) (Air cleaner).

Unclip: The electrical harness (18).

Remove the support (19) (Air cleaner).

Release: The electrical harness (18).

Figure b1bm0mhd

Remove: The control cable (25) (gearbox).

Uncouple:

  • The pipes (21) (Engine cooling radiator)
  • The pipes (24) (heater matrix)
  • The vacuum pipe (22) (Brake servo)
  • The fuel vapours pipe (23)
Figure b1bm0mjd

Uncouple the engine cooling radiator lower hose (26).

Remove the bolts (27) (air conditioning compressor).

Hang the air conditioning compressor on the vehicle body (as "d").

Figure b1jm043d

Remove:

  • The cross beam (32)
  • The bolts (29) (Front downpipe)
  • The nuts (31)
  • The front downpipe (33)

Remove: The front transverse driveshafts.

N.B.: Dismantling of the front right driveshaft does not require draining of the transfer box   (according to equipment).

Remove:

  • The longitudinal drive shaft   (according to equipment)
  • The front sub-frame
Figure b1bg26ud

Place the vehicle at a height of 50 cm from the ground.

Install the lifting table [0004] with the supports [0005-C], [0005-G] under the engine-gearbox assembly   (via the front of the vehicle).

Mark the location of the lifting table [0004] on the ground.

Lift the elevating platform [0004].

Position:

  • The tool [0005-C] (as "e")
  • The tool [0005-G] (as "f")

ESSENTIAL: Screw the support [0005-C] onto the air conditioning compressor support (as "e") (Risk of tilting of the engine-gearbox assembly).

Figure b1bg26vd

Position the tools [0005-C]   (at "g", "h").

Raise the lifting table [0004] slightly to place the engine-gearbox assembly under stress.

Figure b1bm0mmd

Remove:

  • The nuts (34) (gearbox mounting)
  • The screw and the nut (35) (gearbox mounting)
  • The gearbox mounting (36)
Figure b1bm0mnd

Unscrew: The fixing (37).

Remove: The engine mounting (39) fixings (38).

Slowly lower the lifting table [0004].

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.

Raise the vehicle.

Figure b1bg26xt

Place the engine in a sling: Fit the tool [0199-D]   (at "j").

3. Refitting

CAUTION: At refitting, all the removed seals must be replaced with new seals.

Position:

  • The lifting bench [0004] under the vehicle   (to the marks made during removal)
  • The vehicle has a height of 50 cm

Lift the elevating platform [0004].

CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body; If necessary move the engine-gearbox assembly to facilitate its repositioning.

Reposition the engine-gearbox assembly opposite its upper fixings.

Refit:

  • The gearbox mounting (36)
  • The fixing (35)
  • The nuts (34)
  • The engine mounting (39)
  • The mountings (38)
  • The fixing (37)

CAUTION: Adhere to the tightening torques.

Remove the tool [0005-C] (Air conditioning compressor support) (as "e").

Withdraw the lifting bench [0004] from under the vehicle.

Refit:

  • The front sub-frame
  • The longitudinal drive shaft   (according to equipment)
  • The front transverse driveshafts

Refit:

  • The front downpipe (33)
  • The seals (28), (30)   (new)
  • The bolts (29) (Front downpipe) (new)
  • The nuts (31)   (new)
  • The cross beam (32)
Figure b1gm04td

Refit the air conditioning compressor; Tighten the air conditioning compressor fixing screws ()   (in the order indicated).

Refit the power steering pump (7).

CAUTION: Adhere to the tightening torques.

Refit the ancillary belt.

Couple up:

  • The pipes (26), (21), (24)
  • The vacuum pipe (22) (Brake servo)
  • The fuel vapours pipe (23)

N.B.: Replace all of the removed spring clips.

Refit:

  • The control cable (25) (gearbox)
  • The bracket (19) (Air cleaner)
  • The 3 earth cables (16), (11) and (9)

Reconnect:

  • The connector (15)
  • The connectors (14)

Refit:

  • The bracket (14) (Engine ECU)
  • The engine management ECU
  • The mounting lug (13)
Figure b1hm0ezd

Couple up: The fuel pipe click-fit union (as "a").

CAUTION: Check the indexing (at "k") and locking (at "a") of the click-fit union.

Carry out:

  • The engine oil filler neck
  • Fill and top up the gearbox oil

Bleed and top-up the cooling circuit to level.

Continue the fitting operations in the reverse order to removal.

CAUTION: Perform the operations to be carried out following reconnection of the battery.

Reconnect the battery.

Parts & tools for this job For 2007 Citroën C-Crosser

As an Amazon Associate we earn from qualifying purchases.