Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Rear seats19 Electrical - general20 Starting and charging21 Wiring harnesses22 Locking, alarm and airbags23 Electrical - driver assistance systems24 Heating, air conditioning and audio
Citroën C-Crosser Factory Workshop Manual (2007-2012)02 · Gearbox and clutch
02 · Transmission

Removing - Refitting: hydraulic valve block

Make
Citroën
Model
C-Crosser Factory Workshop Manual
Year
2007–2012
Section
Gearbox › Removing - Refitting: hydraulic valve block
Gearbox and clutchRemoving - Refitting: hydraulic valve block

Removing - Refitting: hydraulic valve block

Citroën C-Crosser · Removal-fitting · Ref. B2CG0123P0

Applies to: Continuous transmission 4X4 or 4X2 continuous transmission

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Removing

Put the vehicle on a hoist.

CAUTION: After the ignition has been switched off: Wait 15 minutes before disconnecting the battery to ensure that the programmed values of the various ECUs are stored.

Disconnect the battery.

Drain: The continuously variable transmission.

Remove the front left side mud guard.

Figure b2cm0ebd

Disconnect the connector (as "a").

Figure b2cm0ecd

Mark the position of the connector.

Remove the clip (1).

Push the connector into the gearbox.

Figure b2cm0edd

Remove:

  • The bolts (2)
  • The hydraulic block casing (3)
  • The hydraulic block casing seal
Figure b2cm0eed

Remove:

  • The bolts (4), (5)
  • The oil filter (6)
Figure b2cm0efd

Remove:

  • The bolts (7)
  • The bracket (8)
Figure b2cm0egd

Remove:

  • The nut (9)
  • The lever from the control (10)
Figure b2cm0ehd

Insert a 3 mm diameter pin punch (11) (as "b").

Figure b2cm0ejd

N.B.: The pin punch (11) supports the lever (12).

Figure b2cm0ekd

Remove the hydraulic block (15) bolts (13) and (14).

Figure b2cm0eld

Release and remove the hydraulic valve block (15).

Figure b2cm0emd

Remove the bush (16).

CAUTION: Support the manual regulation valve (17).

2. Refitting

Figure b2cm0end

CAUTION: Refit a new seal (18).

Figure b2cm0epd

Replace the "O" ring seal (19).

Refit the bush (16).

Figure b2cm0ehd

Insert a 3 mm diameter pin punch (11) (as "b").

Figure b2cm0ejd

N.B.: The pin punch (11) supports the lever (12).

Engage the hydraulic block connector in its location.

Refit: A new clip (1).

Figure b2cm0ekd

CAUTION: The length of the bolt (13) is different from that of the bolts (14).

Refit:

  • The hydraulic valve block (15)
  • The screws (13) and (14); Tighten to 0,8 ± 0,1 daN.m

Remove: The pin punch (11).

Figure b2cm0egd

Refit:

  • The control lever (10) in the slot on the sliding block (as "c")
  • The nut (9); Tighten to 2,2 ± 0,2 daN.m
  • The bracket (8)
  • The bolts (7); Tighten to 0,8 ± 0,1 daN.m
Figure b2cm0eqd

Replace the joint (20).

Figure b2cm0eed

CAUTION: The length of the bolt (5) is different from that of the bolts (4).

Refit:

  • The screws (4) and (5); Tighten to 0,8 ± 0,1 daN.m
  • The oil filter (6)
Figure b2cm0erd

Position the new hydraulic block casing seal (as "d").

Refit:

  • The hydraulic block casing (3)
  • The bolts (2); Tighten to 0,8 ± 0,1 daN.m

Refit the front left hand splash-shield.

Reconnect the connector (as "a").

Fill and top up the continuously variable transmission.

Reconnect the battery.

ESSENTIAL: Perform the operations to be carried out following reconnection of the battery.

Carry out the following operations using the diagnostic tool:

  • Updating the oil wear counter
  • A programming sequence (Replacement Parts Menu)

Parts & tools for this job For 2007 Citroën C-Crosser

As an Amazon Associate we earn from qualifying purchases.