Removing - Refitting: Piloted manual gearbox
- Make
- Citroën
- Model
- C-Elysée Factory Workshop Manual
- Year
- 2012–2020
- Section
- Gearbox › Removing - Refitting: Piloted manual gearbox
Removing - Refitting: Piloted manual gearbox
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Systematically replace the following parts
| Designation | Quantity |
|---|---|
| Gearbox centring pin | 2 |
2. Tooling
Equipment:
- Workshop hoist
- Trolley jack
- Soft block
3. Preliminary operations
CAUTION: Lock the gearbox actuator in the dismantling position before removing it.
4. Removing
Raise and support the vehicle on a 2 -post lift.
Disconnect the (1) ancillaries battery.
Remove:
- The engine management ECU cover (2)
- The engine management ECU
- The air inlet pipe (4)
- The air inlet neck (3) (according to equipment)
- The ancillaries battery (1)
- The ancillaries battery tray
Unclip and move aside the electrical harnesses attached to the ancillaries battery tray support (6).
Remove:
- The (5) bolt
- The ancillaries battery tray support (6)
Raise the vehicle.
Remove:
- The front wheels
- The front left-hand splash-shield
- Move aside the electrical harness
Drain the gearbox.
Remove the right and left drive shafts.
Remove:
- The gearbox actuator (7)
- The earth cable (9) bolt (8)
Move the earth cable (9) aside.
Remove:
- The bolts (16)
- The stabiliser bar (15)
- The gearbox ECU and support assembly (11)
- The clutch actuator (10)
- The bolts (12), (13)
- The reaction link (14)
- The clip of the exhaust flexible pipe
- The 3 starter bolts
Move aside and secure:
- The starter motor
- The front exhaust pipe
N.B.: (17) The upper bolts coupling the gearbox on the engine.
Remove the 3 lower bolts (20) coupling the gearbox on the engine.
Remove:
- The bolt (18)
- The nut and the stud (19)
Support the engine; Using a roller jack and a soft block.
Sling the gearbox; Using a workshop crane.
Remove:
- The 2 bolts (21)
- The gearbox upper mounting bolts (17)
Lower the engine-gearbox assembly a few centimetres: Using the roller jack and the workshop hoist.
Remove the gearbox.
5. Refitting
Check:
- There are no oil leaks at the stop guide seal
- That there is no leak at the crankshaft seal
- The state of wear of the clutch
Rectify (if necessary).
Protect the interior of the clutch housing from splashes of grease.
Clean the primary shaft and the stop guide by hand using a metal brush in order to eliminate all traces of oxidation.
N.B.: For these operations: Use the products recommended by the manufacturer.
Spray the recommended lubricant evenly onto the thrust guide and the primary shaft.
Grease the fingers of the clutch fork.
Remove the surplus grease on the top of the grooves and the end of the input shaft using a cloth.
N.B.: An excess of grease will contaminate the clutch friction plate and cause noise in neutral, slipping or juddering of the clutch.
CAUTION: If the clutch disc is reused, the disc hub must be free of traces of oxidation; Clean the bolt threads.
N.B.: Check the presence of new gearbox centring pins On refitting, the clutch stop must be on its guide and positioned by the clutch release fork.
Clean the bolt threads.
CAUTION: Do not crush the starter motor electrical harness while refitting the gearbox.
CAUTION: Adhere to the tightening torques.
Tightening torques:
- Gearbox
- Engine/gearbox coupling
- Transmission
- Road wheels
- Engine/gearbox mountings
Tightening torques:
Attach the gearbox to the engine; Using a workshop jack and a workshop crane.
Position the engine/gearbox assembly; Using a workshop jack and a workshop crane.
Refit:
- The bolts (17), (18), (20)
- The nut and the stud (19)
- The 2 bolts (21)
Release:
- The workshop crane
- The workshop jack
Refit:
- The front exhaust pipe
- The starter motor
- The 3 starter bolts
- The reaction link (14)
- The bolts (12), (13)
- The clutch actuator (10)
- The gearbox ECU and support assembly (11)
CAUTION: The clutch actuator needs to be adjusted after refitting.
Refit:
- The stabiliser bar (15)
- The bolts (16)
- The drive shafts
Fill the gearbox to the correct level.
Refit:
- The earth cable (9)
- The earth cable (9) bolt (8)
- The gearbox actuator (7)
- The ancillaries battery tray support (6)
- The bolt (5)
Secure all the electrical harnesses attaching to the ancillaries battery tray support (6).
Refit:
- The ancillaries battery tray
- The ancillaries battery (1)
- The air inlet neck (3) (according to equipment)
- The air inlet pipe (4)
- The engine management ECU
- The engine management ECU cover (2)
CAUTION: Perform the operations that are required following a reconnection of the ancillaries battery.
Reconnect the (1) ancillaries battery.
Refit:
- The front left-hand splash-shield
- Move aside the electrical harness
- The front wheels
6. Additional operations
After refitting, initialise the actuators (10) and (7); Using a diagnostic tool.
Parts & tools for this job For 2012 Citroën C-Elysée
- PARTClutch kitSearch: Citroën C-Elysée 2012 clutch kit
- TOOLClutch alignment toolSearch: clutch alignment tool
- FLUIDGear oilSearch: Citroën C-Elysée manual gearbox oil
As an Amazon Associate we earn from qualifying purchases.