Workshop Manuals Factory service & repair Citroën
01 Engine02 Gearbox and clutch03 Transmission and driveshafts04 Suspension05 Steering06 Brakes07 Body - front section08 Body - rear section09 Body - side structure10 Front doors and trim11 Rear doors and trim12 Body - roof and headlining13 Body shell14 Lighting and signalling15 Wipers and washers16 Fascia and interior panels17 Front seats18 Electrical - general19 Starting and charging20 Locking, alarm and airbags21 Heating, air conditioning and audio
Citroën Jumper II Factory Workshop Manual (2002-2006)01 · Engine
01 · Engine

Checking: Setting the valve timing

Make
Citroën
Model
Jumper II Factory Workshop Manual
Year
2002–2006
Section
Timing gear › Checking: Setting the valve timing
EngineChecking: Setting the valve timing

Checking: Setting the valve timing

Citroën Jumper II · Checks · Ref. B1ED0125P0

Applies to: 2.3 td (sofim EURO5) or 2.3 td (sofim)

ESSENTIAL: Observe the safety and cleanliness recommendations.

1. Tooling

Equipment:

  • A trolley jack
  • A block
toolReferenceDesignation
Figure e5ab0uft
[0191-2A]Crankshaft setting rod
Figure e5ab0ugt
[0191-2B]Camshaft probe
Figure e5ab0syt
[0191-3A]Setting pin for camshaft pulley
Figure e5ab0ddt
[0132-AA]toothed belt pinion locking tool

2. Removing

ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.

Place the vehicle on a 2-post lift.

Disconnect the battery negative terminal.

Figure b1bd05kd

Remove:

  • The battery (1)
  • The battery support (7)
  • The 2 nuts (3) from the support (6) of the power steering reservoir (2)
  • The 2 bolts (5) from the support (6) of the power steering reservoir (2)
  • The engine cover (4)

Release and move aside the electrical harness   (at "a").

Move the power steering reservoir (2) and its support (6) aside.

Figure b1bd063d

Slacken the clip (9).

Detach and move aside: The air hose (8).

Disconnect the connector (en "b").

Remove the bolt (10).

Figure b1bd05ld

Remove:

  • The 4 support (11) bolts (12)
  • The support (11)
Figure b1ed09sd

Unscrew - Remove the 2 camshaft main bearing cap casing plugs (13).

Raise the vehicle.

Remove:

Figure b1ed0akd

Remove:

  • The 4 ancillary drive pulley (16) bolts (17)
  • The ancillary drive pulley (16)
  • The roller tensioner (19) bolt (18)
  • The roller tensioner (18)
  • The bolt (15) securing the roller (14)
  • The tensioning roller (14)

CAUTION: Support the engine-gearbox assembly; With a trolley jack and a block.

Figure b1bd05md

Support the engine-gearbox assembly; With a trolley jack and a block.

Remove:

  • The 2 bolts (20)
  • The 4 nuts (22)
  • The engine mounting assembly (21)
Figure b1ed09ud

Remove:

  • The 9 bolts (23)
  • The timing cover (24)

Refit: The engine mounting assembly (21).

Figure b1ed09vd

Unscrew and remove: The cap (25).

3. Checking

CAUTION: The timing must be set with no stress. If this is not the case, repeat the timing belt setting operations.

CAUTION: If the timing belt has covered more than 25000 kilometres, replace it.

3.1. Visual check

CAUTION: Carry out the checks below.

Check that the timing belt is free of cracks and traces of oil.

Check the absence of oil leaks (crankshaft and camshaft sealing rings).

Check the absence of coolant fluid leaks   (coolant pump).

Replace any defective parts.

3.2. Checking the valve timing

CAUTION: Never turn back.

Figure b1ed0amd

Turn the crankshaft clockwise until the hole for the pin "c" in the camshaft fully (26) and the hole for the pin in the cover "d" are visually aligned.

Figure b1ed0and

Fit the tool [0191-2B]   (at "e").

Figure b1ed0aod

Fit the tool [0191-2A]   (at "f").

N.B.: The tools [0191-2A] and [0191-2B] must be screwed in respectively   (at "e", "f").

Figure b1ed0a3d

Pin the camshaft pulley (26); Using tool [0191-3A].

CAUTION: If it is impossible to peg the camshaft, check that the offset between the camshaft pulley hole and the pegging hole is not greater than 1 mm; If this is not the case, repeat the cambelt fitting procedure.

4. Refitting

ESSENTIAL: Adhere to the tightening torques.

Tightening torques:

Remove the tools [0191-2A], [0191-3A], [0191-2B].

Refit the plug (25).

Support the engine-gearbox assembly; With a trolley jack and a block.

Remove: The engine mounting assembly (21).

Refit:

  • The timing cover (24)
  • The 9 bolts (23)
  • The engine mounting assembly (21)
  • The 4 nuts (22)
  • The 2 bolts (20)
  • The tensioning roller (14)
  • The bolt (15) securing the roller (14)
  • The roller tensioner (18)
  • The roller tensioner (19) bolt (18)
  • The ancillary drive pulley (16)
  • The 4 ancillary drive pulley (16) bolts (17)
  • The auxiliary equipment drive belt
  • The protective panel under the engine
  • The 2 plugs (13) of the camshaft bearing cap cover
  • The support (11)
  • The 4 support (11) bolts (12)
  • The (10) bolt

Connect the connector   (at "b").

Couple up: The air hose (8).

Tighten the clip (9).

Clip the electrical harness   (at "a").

Refit:

  • The engine cover (4)
  • The power steering reservoir (2) with its bracket (6)
  • The 2 nuts (3) from the support (6) of the power steering reservoir (2)
  • The 2 bolts (5) from the support (6) of the power steering reservoir (2)
  • The battery support (7)
  • The battery (1)

CAUTION: Perform the operations to be carried out following reconnection of the battery.

Reconnect the battery.

Parts & tools for this job For 2002 Citroën Jumper

As an Amazon Associate we earn from qualifying purchases.