Removing - refitting: Engine/gearbox assembly (DV6UTED4)
- Make
- Citroën
- Model
- Jumpy III Factory Workshop Manual
- Year
- 2007–2016
- Section
- Engine assembly › Removing - refitting: Engine/gearbox assembly (DV6UTED4)
Removing - refitting: Engine/gearbox assembly (DV6UTED4)
ESSENTIAL: Observe the safety and cleanliness recommendations.
1. Recommended tools
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [1] | lifting bench | 5702-T.A | (-).0004 |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [2] | plugs kit | (-).0194-T | (-).0194-T |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [3] | pliers for removing and refitting hose clips | 9029-T | (-).0166 |
| Components | Designation | Reference | Reference |
|---|---|---|---|
| [4] | engine supports | 5704-T | (-).0005.G |
| [5] | Engine mounting with reversible tool | 5704-T | (-).0005.C |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [6] | Set of 2 hose clamps | 4153-T | (-).1512 |
| Reference | Designation | Reference | Reference |
|---|---|---|---|
| [7] | CLIC clip pliers | (-).0172-Z | (-).0172-Z |
| Components | Designation | Reference | Reference |
|---|---|---|---|
| [8a] | ball-joint extractor (diameter 10 mm) | (-).0338-E | (-).0216-G1 |
| [8b] | ball-joint extractor (diameter 13 mm) | (-).0338-E | (-).0216-G2 |
2. Removing
ESSENTIAL: Respect the safety and cleanliness recommendations that are specific to high pressure diesel injection (HDi) engines.
N.B.: Remove the engine-gearbox assembly from the front of the vehicle.
ESSENTIAL: Vehicle with pneumatic suspension: Deactivate the pneumatic suspension before lifting the vehicle (2 or 4 post lift, workshop jack or customer’s jack).
Place the vehicle on a 2-post lift.
ESSENTIAL: Strap the vehicle on the 2 column lift.
Disconnect the battery.
Remove the engine style cover.
Drain:
- The cooling system
- The gearbox (see the relevant operation)
Remove:
Uncouple the exhaust hose from the catalytic converter.
Remove the exhaust line flexible mountings.
Move aside the exhaust line.
Remove:
- The venting unit (1)
- The water evacuation pipes (3), (4), (10)
- The air inlet manifold (2)
- The bumper crossmember (5)
- The engine compartment lower crossmember (6) (according to equipment)
- The relay box (9)
Release:
- The bonnet opening cable (8)
- The venting unit (1)
- The relay box (9)
Disconnect and move aside the cooling cassette (7) electrical harnesses.
Remove:
- The cooling cassette (7) fixing bolts
- The engine turbocharger air cooler ()
- The engine cooling radiator
2.1. Vehicle with air conditioning
Disconnect the connector "a".
Remove:
- The accessories drive belt
- The 4 bolts (11)
Without uncoupling the piping, move aside and secure the air conditioning compressor (12).
Separate the air conditioning condenser from the cooling cassette (7) (without opening the air conditioning fluid circuit).
Move aside and clamp the air conditioning condenser.
2.2. Common operations
Remove the cooling cassette (7).
Fit a hose clamp [6] on the piping (18).
Disconnect, blank off and move aside:
- The steering hydraulic circuit (14) high pressure piping
- The pipe (18)
Remove the power steering fluid reservoir (13) (Without opening the hydraulic circuit).
Unclip and move aside the power steering fluid reservoir (13) and piping (16) assembly.
Remove:
- The lower crossmember (17)
- The clutch slave cylinder (15) fixings
Move aside the clutch slave cylinder (15) (Without opening the hydraulic circuit).
Move aside the electrical harness (at "b").
Remove:
- The engine fuse box cover (19)
- The securing clip 20
Uncouple and move aside the fuel supply and return pipes (at "d"); Plug by means of the tool [2].
Disconnect the electrical harness (at "c").
Unclip the wiring harness from the body and move it aside.
Remove:
- The (27) bolt
- The air duct (26)
Detach and move aside:
- The vacuum pipe (22)
- The hoses (21); Using tool [3]
Disconnect the pneumatic suspension ECU connectors (according to equipment).
Remove the pneumatic suspension ECU (according to equipment).
Unplug:
- The pre-post heating relay (23)
- The engine management ECU (24)
Disconnect and move aside:
- The earth wire on the front left chassis member
- The engine harness (25) attached to the body
Uncouple and move aside the gearbox controls (28); Using tool [8].
Disconnect the reversing lamps connector () (on the gearbox).
Disconnect the earth wire () (on the gearbox).
Remove the lower torque reaction rod from the engine subframe.
Position the lifting table [1] and the supports [4] (under the engine/gearbox assembly).
Fix the intermediate support [4a] on the left-hand driveshaft bearing (at "e").
Fix the tool [4b] on the air conditioning compressor support (at "f").
Fit the tool [4c] on the blind hole on the gearbox (at "h").
Fitthe tool [5] in the blind hole on the cylinder block (at "g").
Tighten all of the fixings of the supports [4], [5].
Lift the engine-gearbox assembly slightly (using the lifting bench [1]).
Mark the location of the lifting table [1] on the ground.
Remove:
- The 3 support (30) bolts (29)
- The nut (34) (Retrieve the washer)
- The 2 bolts (31)
- The bracket (35)
- The 4 bolts (32)
- The plate (33)
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Lower the power unit assembly; Using the lifting table [1].
3. Refitting
CAUTION: At refitting, all the removed seals must be replaced with new seals.
CAUTION: Ensure that there is no fouling between the engine-gearbox assembly and the body.
Position the lifting bench [1] with the engine-gearbox assembly at the marks made at removal.
Position the engine-gearbox set; Using the lifting table [1].
Refit:
- The plate (33)
- The 4 bolts (32); Tighten to 2,7 ± 0,3 daN.m
- The bracket (35)
- The 2 bolts (31); Tighten to 3 ± 0,3 daN.m
- Nut (34) and washer; Tighten to 6,5 ± 0,6 daN.m
- The 3 support (30) bolts (29)
Remove the tools [4], [5].
Withdraw the lifting table from under the vehicle.
Refit:
- The reaction link (37)
- The (38) bolt; Tighten to 8,7 ± 0,9 daN.m
- The (36) bolt; Tighten to 5,8 ± 0,6 daN.m
Reconnect the reversing lamps connector () (on the gearbox).
Reconnect the earth wire (on the gearbox).
Couple the gearbox controls (28).
Adjust the gearbox controls (see the relevant operation).
Refit:
- The clutch slave cylinder (15)
- The bolts (39); Tighten to 1,9 ± 0,3 daN.m
3.1. Vehicle with air conditioning
Unclamp the air conditioning compressor (12).
Refit:
- The air-conditioning compressor (12); Tightening to 2,4 ± 0,6 daN.m
- The 4 bolts (11)
- The accessories drive belt
Connect the connectors of the air conditioning compressor ().
Unclamp the air conditioning condenser.
Fix the air conditioning condenser on the cooling cassette (7).
3.2. Common operations
Proceed in the reverse order to removal.
Couple the exhaust hose on the catalytic converter.
Refit the exhaust line flexible mountings.
N.B.: Tighten to the specified torque.
Refit:
Fill the gearbox to the correct level (see the relevant operation).
Fill, bleed and top up the level of the cooling circuit.
Top up the engine oil.
Reconnect the battery.
Perform the operations to be carried out following reconnection of the battery.
4. Checks
Check the functioning of the air conditioning (according to equipment).
Carry out:
- A road test
- A reading of the auto-diagnostic memories
Parts & tools for this job For 2007 Citroën Jumpy
- PARTEngine gasket setSearch: Citroën Jumpy 2007 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.